Sustainability Journal (MDPI)
2009 | 1,010,498,008 words
Sustainability is an international, open-access, peer-reviewed journal focused on all aspects of sustainability—environmental, social, economic, technical, and cultural. Publishing semimonthly, it welcomes research from natural and applied sciences, engineering, social sciences, and humanities, encouraging detailed experimental and methodological r...
Matching Demolition and Construction Material Flows, an Urban Mining Case Study
Teun Johannes Verhagen
Institute of Environmental Sciences, Leiden University, 2333 CC Leiden, The Netherlands
Marijn Louise Sauer
Leiden Municipality, 2333 CW Leiden, The Netherlands
Ester van der Voet
Institute of Environmental Sciences, Leiden University, 2333 CC Leiden, The Netherlands
Benjamin Sprecher
Institute of Environmental Sciences, Leiden University, 2333 CC Leiden, The Netherlands
Download the PDF file of the original publication
Year: 2021 | Doi: 10.3390/su13020653
Copyright (license): Creative Commons Attribution 4.0 International (CC BY 4.0) license.
[[[ p. 1 ]]]
[Summary: This page is the first page of a sustainability article about matching demolition and construction material flows in an urban mining case study. It includes the authors, publication details, and an abstract summarizing the study's focus on recycling demolition waste to reduce primary material demand in the construction sector.]
[Find the meaning and references behind the names: Just, Teun, New, Louise, Doi, Ester, Plan, January, Level, Basel, Western, Road, Urban, Johannes, Europe, Cml, Verhagen, Dutch, Falls, Wide, Maps, Time, Triple, December, Ever, Share, Benjamin, Large, Data, Under, High, Year, Gis, Open, Sauer, Case, Past, Lower, Study, Goal, Strong, Marijn, Quality, Voet, Short, Focus, Look]
sustainability Article Matching Demolition and Construction Material Flows, an Urban Mining Case Study Teun Johannes Verhagen 1, * , Marijn Louise Sauer 2 , Ester van der Voet 1 and Benjamin Sprecher 1 Citation: Verhagen, T.J.; Sauer, M.L.; van der Voet, E.; Sprecher, B Matching Demolition and Construction Material Flows, an Urban Mining Case Study Sustainability 2021 , 13 , 653. https:// doi.org/10.3390/su 13020653 Received: 11 December 2020 Accepted: 8 January 2021 Published: 12 January 2021 Publisher’s Note: MDPI stays neutral with regard to jurisdictional claims in published maps and institutional affiliations Copyright: © 2021 by the authors. Licensee MDPI, Basel, Switzerland This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https:// creativecommons.org/licenses/by/ 4.0/). 1 Institute of Environmental Sciences, Leiden University, 2333 CC Leiden, The Netherlands; voet@cml.leidenuniv.nl (E.v.d.V.); sprecher@cml.leidenuniv.nl (B.S.) 2 Leiden Municipality, 2333 CW Leiden, The Netherlands; m.sauer@leiden.nl * Correspondence: t.j.verhagen@cml.leidenuniv.nl Abstract: The recycling of demolition waste is essential to lower the construction sectors primary material demand, responsible for 50% of the global primary material consumption. Almost all demolition waste is used as filler material for the construction of roads, preventing further reuse or recycling after this application. The built environment generates considerable annual material in-and outflows. However, there has been little discussion on the availability and further application of this potential supply of secondary materials as a replacement for primary materials. In this study, we quantify the percentage of demolition waste that can be repurposed as secondary materials in the Dutch construction sector. We analyzed the yearly building material flows for the municipality of Leiden using municipal data on demolition and construction to explore the viability of the Dutch government’s policy goal to reduce primary materials consumption by 50% before 2030. From this analysis, we find that the recycling of demolition waste has a sizable potential but just falls short of the stated policy goal. Even in a situation with more construction than demolition, there will remain a considerable mismatch in the yearly construction material demand and available supply of demolition waste for our municipal-wide case study. More importantly, the current processing of demolition waste in the Netherlands will require significant improvements to achieve this goal. New governmental policies are required to focus on maintaining material quality and allowing further use of recycled materials as buildings materials Keywords: urban mining; circular economy policy; GIS 1. Introduction The worldwide extraction of materials has tripled over the past 40 years. Driven by the urbanization of the developing world and an ever-growing population, the global demand for materials is expected to triple again before 2050 [ 1 ]. The construction sector is currently responsible for a significant share (50%) of this material demand [ 2 ]. In Western Europe, the construction sector accounts for 40% of primary material use [ 3 ]. At the same time a substantial percentage of the built environment is demolished each year, especially in already developed urban regions, which generates large volumes of waste that could be reused as secondary construction material Currently, construction and demolition waste (C&DW) is most commonly reused as aggregates as road foundation [ 4 ]. The materials are downcycled, and further reuse is not possible. To prevent this wasteful form of reuse, one can look at urban mining as a concept for reclaiming and high-level recycling materials from the built environment [ 5 , 6 ]. Based on the European Commission’s Circular Economy Action Plan, the Dutch government formulated its circular economy policy to reduce the country-wide use of primary materials (minerals, metals, and fossil fuels) by 50% before 2030, including the construction sector [ 7 , 8 ]. In this paper, we quantify to what extent secondary materials generated through urban mining could replace the primary material demand in the Dutch construction sector Sustainability 2021 , 13 , 653. https://doi.org/10.3390/su 13020653 https://www.mdpi.com/journal/sustainability
[[[ p. 2 ]]]
[Summary: This page explores the potential mismatch between building material supply and demand, using Leiden as a case study. It discusses building material stock dynamics, reuse potential, and references studies on material stocks and flows in various countries, highlighting the importance of recycling demolition waste as secondary materials.]
[Find the meaning and references behind the names: Range, Modern, Real, Work, Grey, Life, Single, Closed, Present, Topic, China, Heeren, Fishman, Areas, Size, Hand, Few, Lot, Glass, Bag, Rate, Stocks, Stock, Marinova, Padua, Able, End, Match]
Sustainability 2021 , 13 , 653 2 of 14 We also explore the potential yearly mismatch between the building material supply and demand and its influence on the recycling of demolition waste. We use the municipality of Leiden as a representative case study for three reasons. First, it is a typical medium-sized Dutch municipality (around 125,000 inhabitants) with a lot of old historical buildings in the city center and more modern surrounding areas. Second, based on the Dutch policy goals [ 8 ], the municipality of Leiden developed their building material policies [ 9 ]. Finally, the municipality of Leiden has been registering data on demolition and construction work, which enables us to quantify the construction material demand and supply in this municipality over time. Our municipal-wide analysis provides implications for building material recycling for the Netherlands as a country. Furthermore, we analyze the yearly building material flows and explore the Dutch construction sector’s goal to reduce primary material consumption by 50% before 2030 [ 8 ]. Building Material Stock Dynamics and Reuse Potential Recently, multiple building material databases have been published to harmonize the available data on building materials, enabling the comparison of studies and their data between multiple countries. Continuing on the earlier work by [ 10 , 11 ], Heeren and Fishman summarized 301 building material data points across 21 countries [ 12 ]. Using the currently available building data, Marinova et al. (2020) and Deetman et al. (2020) were able to estimate global building material stocks and flows for residential and service sector buildings [ 13 , 14 ]. Müller, (2006), established the cyclical behavior of demolition and construction materials flows, with the availability of demolition waste lagging behind the construction material demand in size and time [ 15 ]. Until a building stock is saturated, logically, a mismatch in the availability of demolition waste and the demand for construction materials will occur [ 6 , 16 ]. Numerous studies further developed the modelling of stock dynamics for a wider variety of construction materials and case studies, amongst others, for China [ 17 , 18 ], Switzerland [ 16 , 19 ], Luxembourg, [ 20 ], Japan, [ 21 , 22 ], Padua, Italy, [ 23 ], and the US [ 24 ]. Hypothetically, evenly matched quantities of demolition and construction material flows can lead to a closed construction material cycle. However, as noted by Heeren and Hellweg, (2018), it is important to further explore the recycling potential of demolition waste as secondary materials to achieve this [ 16 ]. In addition to the studies that explored the dynamics of the building material stocks for a wide range of building materials, a few studies have been able to quantify the recycling potential of these building materials. Most of these studies focused on the recycling of a single material or material type, ranging from glass [ 25 ], gypsum [ 26 ], and concrete [ 27 ] to metals [ 28 ]. In the present study, we explore the topic of urban mining and C&DW, by quantitatively assessing the potential supply of secondary materials as a replacement for primary materials. By using real-world data sourced from a medium-sized Dutch city, we can quantify potential yearly (mis)match between the demand for construction material on the one hand, and the supply of demolition waste that realistically be reused as a construction material on the other hand 2. Materials and Methods We quantified the building material stocks and flows for 12 materials in the municipality of Leiden for the period 2019 − 2030. First, we calculated the municipal-wide material stocks and the material flows for this period using the information provided by the municipality on the demolition and construction projects planned between 2019 and 2030. The BAG 3 D, a dataset of the Dutch government containing GIS data on the Dutch building stock was used for the building properties [ 29 ]. We used an end-of-life (EOL) collection rate to determine the demolition waste available for recycling. Based on scientific and grey literature, a recycled content potential in the production of new material was used to determine the maximum amount of demolition waste that can be
[[[ p. 3 ]]]
[Summary: This page details the materials and methods used to quantify building material stocks and flows in Leiden from 2019-2030. It describes the use of material intensity data, building typologies, and the modeling of municipal-wide material stocks using GIS data. It also mentions the inclusion of structural materials and materials from window frames.]
[Find the meaning and references behind the names: Steel, Floor, Less, Garage, File, Iron, Cast, Wood, Peer, Enough, Gravel, Aluminium, Land, Brick, Part, Future, Floors, Rise, Area, Row, See, Knowledge, Clay, Line, Location, Small, House, Roof, Shown]
Sustainability 2021 , 13 , 653 3 of 14 used as a secondary construction material. Furthermore, to determine the reduction in primary material demand, the future demand for construction materials was compared to the potential yearly available supply of secondary materials When available, the yearly surplus of secondary materials was used to determine the overall material mismatch. In this research, we use our case study, the municipality of Leiden, and their available data on demolition and construction to explore the country-wide implications for the Dutch construction sector. The recycling of demolition waste within a municipal-wide boundary is a theoretical assumption and not necessarily the preferred option in a real-life situation. We will debate more on this topic in the discussion section 2.1. Building Typology and Material Intensities Volumes of building materials were calculated using material intensity (MI) data derived from Sprecher et al. (2020, accepted with revisions), which compiled a MI database for the Netherlands. The average MIs in Sprecher et al., (2021, accepted with revisions) range from 604 kg/m 2 for row houses to 2216 kg/m 2 for apartments. Detached houses are among the most material-intensive building categories because foundations have a standardized minimal size and are over-dimensioned for this type of building. Apartments have the highest average MI as Dutch apartment buildings often include a parking garage The other included building categories are more comparable, with an average MI of 604 to 1148 kg/m 2 . The MIs found for the Dutch built environment are in line with the findings of other studies (Sprecher et al., (2020, accepted with revisions) In our analysis, the following building types are used for residential buildings: [a] detached houses, [b] row houses, [c] apartments, [d] high rise; for utility buildings: [e] offices, [f] commercial buildings, and [g] other. Most of these building types were already included in the BAG 3 D dataset and could easily be identified. Only the high-rise buildings were identified separately as residential buildings with more than 5 floors (approximately 20 m in height) The analysis includes structural materials and also materials extracted from window frames, ceilings, doorframes, etc. For the building materials, the following materials were included, concrete, brick, wood, roof gravel, glass, ceramic, gypsum, bitumen, steel, cast iron, aluminum, and others. The category "other" contains a multitude of materials resulting from the demolition process which are difficult to identify and quantify. This category includes all the materials present in buildings that were not mentioned earlier in this paragraph. Figure 1 shows an overview of the average MIs per building type Sustainability 2021 , 13 , x FOR PEER REVIEW 4 of 15 Figure 1. Average material intensity (MI) in kg/m 2 per building type (Sprecher et al., 2020) 2.2. Modelling of the Municipal ‐ Wide Material Stocks To model the building stock, we combined the MIs with the BAG 3 D GIS database for the municipality of Leiden using a Python script and the GeoPandas Python package For the Python script, see Supplementary Information IV The BAG 3 D database contains the dimensions, location, year of construction, and building type of each building in the Dutch built environment [29] Of the 38,990 buildings in the case study, 29,013 are residential and 9997 utility Buildings with less than 15 m 2 of functional floor area, representing sheds and small garage boxes, were filtered out of the dataset Of the 53.173 objects in the BAG 3 D dataset of the municipality of Leiden, 17.345 objects, or 33%, have less than 15 m 2 of functional floor area In terms of total floor area, these smaller objects account for 134.461 m 2 , or 3% of the 4.149.493 m 2 total floor area in Leiden The MI per building type was projected on the GIS file of buildings planned for demolition For each building, the material stocks were calculated, based on the building type, functional floor area and year of construction As a result, the material stocks per building were calculated as follows {?}{?}{?}{?}{?}{?}{?}{?}{?} , , {?}{?}{?}{?}{?}{?} {?}{?} , , {?}{?}{?}{?}{?}{?} m {?}{?}{?}{?}{?} {?}{?}{?}{?} m (1) where the MI for each material ( j ) is dependent on the building type ( k ) and the year of construction ( l ) Although we do not have enough data to make statistical inferences, we do observe in the data that older residential buildings (<1950) contain more brick and wood in comparison with more recently constructed residential buildings For roof gravel and bitumen, the roof area was multiplied with the MI To identify the density of material stocks in the municipality, the total amount of material per building was converted to tonnes per land ‐ related area In the first part of the results, the material stocks per material category and the total building weight are shown 2.3. Modelling of the Material Flows and Stocks for the Period 2019 − 2030 The material supply and demand used in our analysis was based on present knowledge of the planned demolition and construction projects for the case study Between 2019 and 2030, 585,483 m 2 of building floor area is planned to be demolished, while 995,480 m 2 floor area is scheduled for construction The predictability of new materials flows as a result of the planned demolition and construction projects (the 604 983 1116 1145 1148 2012 2216 Residential ‐ Row house Utility ‐ Offices Utility ‐ Commercial Utility ‐ Other Residential ‐ High rise Residential ‐ Detached house Residential ‐ Apartment Concrete Clay brick Wood Roof gravel Aluminium Steel Glass Ceramic Gypsum Bitumen Cast iron Other Figure 1. Average material intensity (MI) in kg/m 2 per building type (Sprecher et al., 2020).
[[[ p. 4 ]]]
[Summary: This page continues detailing the modelling of municipal-wide material stocks using GIS data from the BAG 3D database for Leiden. It specifies the number of residential and utility buildings included in the study, and explains how material stocks were calculated based on building type, floor area, and year of construction.]
[Find the meaning and references behind the names: Gap, Fill, Long, Development, Mines, Capita, Energy, Sankey]
Sustainability 2021 , 13 , 653 4 of 14 2.2. Modelling of the Municipal-Wide Material Stocks To model the building stock, we combined the MIs with the BAG 3 D GIS database for the municipality of Leiden using a Python script and the GeoPandas Python package. For the Python script, see Supplementary Information IV. The BAG 3 D database contains the dimensions, location, year of construction, and building type of each building in the Dutch built environment [ 29 ]. Of the 38,990 buildings in the case study, 29,013 are residential and 9997 utility. Buildings with less than 15 m 2 of functional floor area, representing sheds and small garage boxes, were filtered out of the dataset. Of the 53.173 objects in the BAG 3 D dataset of the municipality of Leiden, 17.345 objects, or 33%, have less than 15 m 2 of functional floor area. In terms of total floor area, these smaller objects account for 134.461 m 2 , or 3% of the 4.149.493 m 2 total floor area in Leiden The MI per building type was projected on the GIS file of buildings planned for demolition. For each building, the material stocks were calculated, based on the building type, functional floor area and year of construction. As a result, the material stocks per building were calculated as follows Materials j , k , l ( tonnes ) = MI j , k , l tonnes m 2 × Floor area m 2 (1) where the MI for each material ( j ) is dependent on the building type ( k ) and the year of construction ( l ). Although we do not have enough data to make statistical inferences, we do observe in the data that older residential buildings (<1950) contain more brick and wood in comparison with more recently constructed residential buildings. For roof gravel and bitumen, the roof area was multiplied with the MI. To identify the density of material stocks in the municipality, the total amount of material per building was converted to tonnes per land-related area. In the first part of the results, the material stocks per material category and the total building weight are shown 2.3. Modelling of the Material Flows and Stocks for the Period 2019 − 2030 The material supply and demand used in our analysis was based on present knowledge of the planned demolition and construction projects for the case study. Between 2019 and 2030, 585,483 m 2 of building floor area is planned to be demolished, while 995,480 m 2 floor area is scheduled for construction. The predictability of new materials flows as a result of the planned demolition and construction projects (the opening of new urban mines) allows a short-term forecast of supply and demand. The long-term development of this material supply and demand is more challenging because building material composition is influenced by more factors, such as the energy transition, increasing residential floor area per capita, and different buildings techniques. The overview of the annual planned demolition and construction per building type can be found in Tables S 1 and S 2 in Supplementary Information I The information provided by the municipality included the number of planned buildings to be demolished and constructed, m 2 of floor area, building types and construction timeframe. Material flows are also generated by refurbishment and repurposing of buildings, but these were not described in the construction and demolition dataset Materials involved in the demolition and construction projects were calculated based on the information of the building types and m 2 of floor area. With this method, we quantify the potentially available material for reuse in a circular economy and the possible mismatch of material demand and supply. The material flows resulting from demolition projects per building type for the period 2019 − 2030 are visualized and quantified in a Sankey diagram. For the years 2026 − 2028, there was no data available on the predicted construction and demolition of buildings. To fill this gap, we extrapolated the average demolitionand construction rate of the years 2019 − 2025, assuming a short-term continuity in the demolition and construction projects The demolitionand construction rate, or the yearly demolition/construction in tonnes divided over the total building stock in tonnes, was also included to explain the size of
[[[ p. 5 ]]]
[Summary: This page explains the calculation of demolition and construction rates based on annual material flows and existing building stock. It details the determination of available secondary materials by using EOL collection and recycling rates. It further explains the assumption of a circular demolition process and the determination of the EOL collection rate.]
[Find the meaning and references behind the names: Purity, Doors, Labor, Mass, Given, Table, Balance, Company, Good]
Sustainability 2021 , 13 , 653 5 of 14 demolition and construction in comparison to the total building stock. This rate was calculated as follows Demolition or construction rate ( % ) = Annual demolition or construction ( tonnes ) Existing building stock ( tonnes ) (2) The total material balance resulting from demolition and construction is calculated and visualized for each year in the period 2019 − 2030. To improve readability, only the two materials with the biggest mass are shown. This overview shows the yearly available materials for reuse and illustrates the difference in the available quantities from demolition and the construction demand over time. The extrapolated data for 2026 − 2028, no data was available for those years, is shown in the corresponding figure with a dotted pattern fill gradient. In Supplementary Information II, the material balance per year is given for each material 2.4. Available Supply of Secondary Materials To determine the viability of the stated policy goal to reduce primary material consumption in the construction sector by 50% before 2030, we calculated the share of primary material demand that can be potentially replaced with demolition waste. First, we determined the available supply of materials resulting from demolition within the case study and the given timeframe. Second, to determine the percentage of demolition waste that could potentially replace primary materials, we used an EOL collection rate and potential recycled content [ 30 ]. The yearly surplus in secondary materials was defined as the mismatch in material supply and demand. Lastly, we quantified how much of these materials could potentially be recycled and utilized as secondary materials by using an end of life recycling rate (EOL recycling rate) [ 30 ]. The total available supply of demolition waste was determined with the calculation presented in Section 2.3 . The EOL recycling rate was calculated as follows EOL recycling rate ( % ) = Recycled demolition waste ( tonnes ) Available supply o f demolition waste ( tonnes ) (3) 2.4.1. End-of-Life Collection of Demolition Waste The recyclability of a material is not only determined by its intrinsic properties, but also by the quality of the recycling streams [ 30 ]. For the demolition of existing buildings, we assumed the use of a circular demolition process. In this process, all the materials are individually harvested from a building to prevent contamination and mixing of material streams. For example, concrete is separately collected instead of mixed in the waste container with the other demolition waste. Smaller objects, such as doors and toilets, are separately collected and kept in good condition. This process is more time-consuming and more labor-intensive than conventional demolition, but it increases the EOL collection rate and the purity of the demolition waste [ 31 ]. The EOL collection rate was calculated as follows EOL collection rate ( % ) = Demolition waste suitable f or recycling ( tonnes ) Available supply o f demolition waste ( tonnes ) (4) We determined the EOL collection rate for each material by conducting interviews with a Dutch demolition company. An overview of the EOL collection rate for each material is given in Table 1 .
[[[ p. 6 ]]]
[Summary: This page presents a table with EOL collection rates and recycled content potential for various materials. It discusses recycling as a solution for demolition waste recovery and the use of recycled content potential to determine the maximum amount of primary materials that can be replaced, highlighting the role of legislation.]
[Find the meaning and references behind the names: Makes, Local, Alloy, Tender, Keep, Main, Iii, Far, Chemical, Impossible, Proper, Factor, Common]
Sustainability 2021 , 13 , 653 6 of 14 Table 1. End-of-Life (EOL) collection rate and recycled content potential for demolition waste Material EOL Collection Rate (%) Recycled Content Potential Concrete 85% [ 31 ] 50% [ 32 ] Clay brick 95% [ 31 ] 50% [ 33 ] Wood 95% [ 31 ] 90% [ 34 ] Glass 95% [ 31 ] 91% [ 25 ] Ceramic 95% [ 31 ] 80% [ 31 ] Gypsum 95% [ 31 ] 40% [ 26 , 35 ] Bitumen 50% [ 31 ] 50% [ 33 ] Steel 95% [ 31 ] 85% [ 36 ] Cast iron 95% [ 31 ] 96% [ 36 ] Aluminium 95% [ 31 ] 50% [ 37 ] 2.4.2. Recycling of Demolition Waste Recycling is currently the most widely applied solution for the recovery of demolition waste as construction materials, while the reuse of building components is far less common [ 4 ]. For our analysis, we assume the use of recycling for the processing of the demolition waste. To determine the potential maximum amount of primary materials that can be replaced with demolition waste, we used the recycled content potential (%). We defined this as the potential maximum fraction of secondary materials in the total input of material production [ 30 ]. For most of the mentioned materials, the main limiting factor of their recycling potential after ensuring the material quality and mechanical properties is the legislation regarding construction materials. While useful to standardize material characteristics, the current legislation limits the addition or recycling of secondary materials in the production process [ 31 ]. New legislation is required to achieve the mentioned recycled content potentials without adversely affecting the material properties whilst maintaining the structural integrity of newly constructed buildings Whereas policy on the recycling of demolition waste is designed and implemented by the Dutch national government, municipalities have a strong influence on a large number of tender contracts. Through requirements in tender contracts to at least use recycled materials, or the proper processing of demolition waste in a demolition project, the municipalities have a method to align the interests of the commercial construction and demolition companies with those of the local and national government The recycled content potentials of the different types of demolition waste were derived from multiple scientific sources (see Table 1 for the overview). By taking the recycled content potential per material from Table 1 and multiplying these with the material demand, we calculated the recycled content limits for each material. These limits were used to calculate the amount of primary material demand that can be replaced with demolition waste in our case study. In reality, the recycling of demolition waste will not be limited to the case study boundaries. During disposal, roof gravel is treated as dangerous waste as it contains multiple harmful chemical compounds [ 34 ], and therefore we excluded the material from the collection and recycling process in the analysis. Our calculations for the recycling of demolition waste can be found in Supplementary Information III Though some materials theoretically have a recycled content potential of 96%, it is impossible to completely avoid the extraction of primary materials by recycling old materials. For example, in metals impurities and different alloy combinations makes it more difficult to recycle them and keep their desired material properties [ 38 , 39 ]. Primary material input will remain necessary to retain desired material properties, and this input is influenced by the quality of the recycled material [ 38 ]. The secondary materials available for use in the construction of new buildings were calculated by multiplying the EOL
[[[ p. 7 ]]]
[Summary: This page describes the calculation of secondary material availability based on demolition waste, EOL collection rate, and recycled content potential. It then presents results on municipal-wide material stocks in Leiden for 2018, listing the mass of various building materials like concrete, brick, wood, glass, and metals.]
[Find the meaning and references behind the names: Taller, Show]
Sustainability 2021 , 13 , 653 7 of 14 collection rate and the recycled content potential with the demolition waste. Based on the following, the availability of the secondary materials was calculated as follows Secondary materials j ( tonnes ) = demolition waste j ( tonnes ) ∗ EOL collection rate j ( % ) × Recycled content potential j ( % ) (5) With the secondary material availability calculated for each material ( j ). This calculation is applied to the results in Sections 3.2 and 3.2.2 . 3. Results 3.1. Municipal-Wide Material Stocks The built environment of Leiden in 2018 contains 18 × 10 3 kilotons of materials (Table 2 ). The two largest material stocks are concrete (11 × 10 3 kilotons) and clay brick (4.0 × 10 3 kilotons). Wood, glass, steel and Gypsum stocks comprise between 0.64 × 10 3 and 0.18 × 10 3 kilotons. The smallest material stocks are ceramic, roof gravel, aluminum, cast iron and bitumen, ranging from 110 to 42 kilotons. Furthermore, in the total material stock, we found 930 kilotons of other materials. The material density of most buildings was measured at around 1–4 tonnes per m 2 . For taller buildings in Leiden, material density varies between 5 and 30 tonnes per m 2 of ground space Table 2. Materials in the built environment of Leiden in 2018 Material Category Mass (Kilotons) Building materials Concrete 11,036 Clay Brick 4022 Wood 642 Roof Gravel 85 Glass 365 Ceramic 110 Gypsum 180 Bitumen 42 Other 928 Metals Steel 192 Cast iron 53 Aluminium 63 Total 17,718 The results presented in Figure 2 show that the material stocks largely consist of concrete and clay brick, followed by wood, glass, steel, and gypsum. Metals constitute relatively small stocks in the overall material composition 3.2. Material Flows Resulting from Construction and Demolition for 2019–2030 3.2.1. Material Flows Resulting from Demolition, Aggregate 2019–2030 The demolition of buildings in Leiden for the period 2019 − 2030 will result in a total of 94 × 10 4 tons of material flows. As shown in Figure 3 , concrete (63 × 10 4 tons) and brick (18 × 10 4 tons) account for the largest materials streams. The greatest share of the materials results from the demolition of apartment buildings, offices, high-rise and other types of buildings. Their material impact is explained by the fact the municipality plans to demolish a larger share of these building types. The other material outflows are ranging from 36 × 10 3 tons for wood to 5.2 × 10 3 tons for the other materials category. In Supplementary Materials II, Tables S 3 and S 4 give this information the material flows for each year and building type in tabular format.
[[[ p. 8 ]]]
[Summary: This page shows that material stocks largely consist of concrete and clay brick, followed by wood, glass, steel, and gypsum. It shows the aggregate material outflow per building type in Leiden based on demolition plans from 2019-2030. It also states that on average there was an annual demolition rate of 0.7% and a construction rate of 0.8%.]
[Find the meaning and references behind the names: Full, Flow]
Sustainability 2021 , 13 , 653 8 of 14 Sustainability 2021 , 13 , x FOR PEER REVIEW 8 of 15 The results presented in Figure 2 show that the material stocks largely consist of concrete and clay brick, followed by wood, glass, steel, and gypsum Metals constitute relatively small stocks in the overall material composition Figure 2. The material density of building material stocks in the municipality of Leiden 3.2. Material Flows Resulting from Construction and Demolition for 2019–2030 3.2.1 Material Flows Resulting from Demolition, Aggregate 2019–2030 The demolition of buildings in Leiden for the period 2019 − 2030 will result in a total of 94 × 10 4 tons of material flows As shown in Figure 3, concrete (63 × 10 4 tons) and brick (18 × 10 4 tons) account for the largest materials streams The greatest share of the materials results from the demolition of apartment buildings, offices, high ‐ rise and other types of buildings Their material impact is explained by the fact the municipality plans to demolish a larger share of these building types The other material outflows are ranging from 36 × 10 3 tons for wood to 5.2 × 10 3 tons for the other materials category In Supplementary Materials II, Tables S 3 and S 4 give this information the material flows for each year and building type in tabular format Figure 2. The material density of building material stocks in the municipality of Leiden Sustainability 2021 , 13 , x FOR PEER REVIEW 9 of 15 Figure 3. The aggregate material outflow per building type in Leiden based on the demolition plans over the period 2019– 2030 (tonnes). On average, we found an annual demolition rate of 0.7% and a construction rate of 0.8%. This means that each year the total mass of the building stock in our case study increases with 0.1%. 3.2.2. Secondary Materials Availability from Demolition, Compared to Construction Material Demand on a Timeline from 2019 to 2030 By matching of materials flow on an annual basis, we found that there is a greater demand for construction material than the volume of secondary materials that could be supplied locally from demolition projects. This deficit means that even with a full implementation of circular economy policies, there will be a primary material demand of 41 (2019) up to 170 (2025) kilotons per year within the case study. In Figure 4 we also observe considerable yearly differences between the availability of demolition waste and the demand for construction materials. The planned construction of buildings during the period 2019−2023 can be expected to generate a yearly material demand of 90–180 kilotons per year. The availability of secondary materials has a larger variability per year. Based on the available data for the period 2019−2023, demolition can be expected to generate between 10 and 90 kilotons of secondary material. Figure 3. The aggregate material outflow per building type in Leiden based on the demolition plans over the period 2019–2030 (tonnes) On average, we found an annual demolition rate of 0.7% and a construction rate of 0.8%. This means that each year the total mass of the building stock in our case study increases with 0.1%.
[[[ p. 9 ]]]
[Summary: This page analyzes the availability of secondary materials from demolition compared to construction material demand from 2019-2030. It notes a greater demand for construction material than the supply of secondary materials, leading to a primary material demand of 41-170 kilotons per year and shows a figure of annual secondary material availability.]
[Find the meaning and references behind the names: Mate, Chosen, Harder, Trend, Positive, None]
Sustainability 2021 , 13 , 653 9 of 14 3.2.2. Secondary Materials Availability from Demolition, Compared to Construction Material Demand on a Timeline from 2019 to 2030 By matching of materials flow on an annual basis, we found that there is a greater demand for construction material than the volume of secondary materials that could be supplied locally from demolition projects. This deficit means that even with a full implementation of circular economy policies, there will be a primary material demand of 41 (2019) up to 170 (2025) kilotons per year within the case study In Figure 4 we also observe considerable yearly differences between the availability of demolition waste and the demand for construction materials. The planned construction of buildings during the period 2019 − 2023 can be expected to generate a yearly material demand of 90–180 kilotons per year. The availability of secondary materials has a larger variability per year. Based on the available data for the period 2019 − 2023, demolition can be expected to generate between 10 and 90 kilotons of secondary material Sustainability 2021 , 13 , x FOR PEER REVIEW 10 of 15 Figure 4. Annual secondary material availability resulting from demolition (positive) and material demand from construction (negative) for the municipality of Leiden from 2019 to 2030 (kilotons, and extrapolated data shown with a pattern fill) The overall trend in Figure 4 shows that the construction material demand during the period 2019 − 2030 exceeds the availability of secondary materials This means that it is harder to match the material demand with the available secondary material supply from demolition, but in the long term, the high construction rate increases the recycling potential for the demolition waste within the boundaries of our case study Between 2019 and 2030, 585,483 m 2 of building floor area is planned to be demolished, while 995,480 m 2 floor area is scheduled for construction The material losses in the collection and recycling of demolition waste further increase the deficit between the secondary materials availability and the construction material demand 3.3. Recycling Potential and Mismatch for Secondary Material Flows Resulting from Demolition On average, secondary materials can supply around 41% of the demand for construction materials in our case study city Furthermore, around 66% of the available demolition waste within our case study can be recycling in the construction of new buildings for the period 2019–2030 (EOL recycling rate, the calculation in Supplementary Materials III, Tables S 6 and S 7) Within the theoretical limits of our chosen case study, meeting the material demand across all materials with secondary supply varies from 29% for bitumen up to 76% for cast iron As shown in Figure 5, none of the materials surpasses the potential recycled content limits, allowing for a considerable recycling potential of materials A downside of this situation is that there will remain a considerable demand for primary materials For concrete, brick, and gypsum, the recycled content limit could prove to be a limitation in a situation where construction and demolition are more evenly matched 28 52 38 63 37 9 53 49 49 49 8 23 ‐ 56 ‐ 104 ‐ 97 ‐ 125 ‐ 113 ‐ 36 ‐ 153 ‐ 98 ‐ 98 ‐ 98 ‐ 49 ‐ 75 9 18 11 12 9 15 14 14 14 6 ‐ 18 ‐ 36 ‐ 24 ‐ 24 ‐ 21 ‐ 9 ‐ 57 ‐ 27 ‐ 27 ‐ 27 ‐ 12 ‐ 18 7 13 9 16 8 9 10 10 10 5 ‐ 11 ‐ 16 ‐ 27 ‐ 34 ‐ 33 ‐ 10 ‐ 36 ‐ 24 ‐ 24 ‐ 24 ‐ 14 ‐ 21 ‐ 41 ‐ 73 ‐ 90 ‐ 93 ‐ 113 ‐ 43 ‐ 170 ‐ 77 ‐ 77 ‐ 77 ‐ 64 ‐ 81 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 Demand Supply Concrete Brick Other Figure 4. Annual secondary material availability resulting from demolition (positive) and material demand from construction (negative) for the municipality of Leiden from 2019 to 2030 (kilotons, and extrapolated data shown with a pattern fill) The overall trend in Figure 4 shows that the construction material demand during the period 2019 − 2030 exceeds the availability of secondary materials. This means that it is harder to match the material demand with the available secondary material supply from demolition, but in the long term, the high construction rate increases the recycling potential for the demolition waste within the boundaries of our case study. Between 2019 and 2030, 585,483 m 2 of building floor area is planned to be demolished, while 995,480 m 2 floor area is scheduled for construction. The material losses in the collection and recycling of demolition waste further increase the deficit between the secondary materials availability and the construction material demand 3.3. Recycling Potential and Mismatch for Secondary Material Flows Resulting from Demolition On average, secondary materials can supply around 41% of the demand for construction materials in our case study city. Furthermore, around 66% of the available demolition waste within our case study can be recycling in the construction of new buildings for the period 2019–2030 (EOL recycling rate, the calculation in Supplementary Materials III, Tables S 6 and S 7). Within the theoretical limits of our chosen case study, meeting the mate-
[[[ p. 10 ]]]
[Summary: This page shows a figure of annual secondary material availability and the overall trend of construction material demand exceeding the availability of secondary materials. It discusses the recycling potential and mismatch for secondary material flows, stating that secondary materials can supply around 41% of the demand.]
[Find the meaning and references behind the names: Key, Rial, Due, Still]
Sustainability 2021 , 13 , 653 10 of 14 rial demand across all materials with secondary supply varies from 29% for bitumen up to 76% for cast iron. As shown in Figure 5 , none of the materials surpasses the potential recycled content limits, allowing for a considerable recycling potential of materials. A downside of this situation is that there will remain a considerable demand for primary materials. For concrete, brick, and gypsum, the recycled content limit could prove to be a limitation in a situation where construction and demolition are more evenly matched Sustainability 2021 , 13 , x FOR PEER REVIEW 11 of 15 Figure 5. Matching construction material supply and demand for Leiden including potential recycled content limits from 2019 to 2030 Of the available demolition waste, 20% cannot be recycled due to mismatches in the yearly demand and supply of demolition waste Another 14% is collected during demolition as material not suitable for recycling (see Supplementary Materials III for the calculation) Matching the timing of demolition and construction projects could be considered to alleviate part of the problem of a mismatch between material supply and demand The results show that the Dutch policy goal of reducing primary material demand by 50% is not achieved In a situation with a lower construction material demand, it will be even harder to recycle the available supply of secondary materials However, a situation with more demolition would increase the number of secondary materials that could replace the primary material demand, especially since the share of recycled content in our case study could still be increased 4. Discussion Achieving a 50% reduction in primary material demand for the Dutch construction sector will require significant changes in the current processing of demolition waste This study provides an analysis of building stocks and flows over time, showing the potential of Urban Mining in reducing primary material demand for the Dutch construction sector A key innovation is that we used the real ‐ world demolition and construction agenda of the municipality of Leiden to quantify and match building material flows on a year ‐ to ‐ year basis Our findings indicate a considerable potential for the recycling of demolition waste The yearly demand for construction materials in our case study can be lowered by around 41% with the use of demolition waste, falling just short of the Dutch policy goal of 50% Furthermore, around 66% of the generated demolition waste can be recycled and implemented in the construction of new buildings at its EOL In our case study city, however, the demand for building materials was higher than the supply of secondary materials, enabling higher recycling rates Crucially, we found that 20% of the demolition waste could not be recycled due to a mismatch in time, where construction material demand occurred in one year and suitable secondary material supply in another 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Concrete Brick Wood Glass Ceramic Gypsum Bitumen Cast iron Aluminium Steel Available secondary material Remaining demand for primary material Recycled content limit Figure 5. Matching construction material supply and demand for Leiden including potential recycled content limits from 2019 to 2030 Of the available demolition waste, 20% cannot be recycled due to mismatches in the yearly demand and supply of demolition waste. Another 14% is collected during demolition as material not suitable for recycling (see Supplementary Materials III for the calculation). Matching the timing of demolition and construction projects could be considered to alleviate part of the problem of a mismatch between material supply and demand The results show that the Dutch policy goal of reducing primary material demand by 50% is not achieved. In a situation with a lower construction material demand, it will be even harder to recycle the available supply of secondary materials. However, a situation with more demolition would increase the number of secondary materials that could replace the primary material demand, especially since the share of recycled content in our case study could still be increased 4. Discussion Achieving a 50% reduction in primary material demand for the Dutch construction sector will require significant changes in the current processing of demolition waste. This study provides an analysis of building stocks and flows over time, showing the potential of Urban Mining in reducing primary material demand for the Dutch construction sector. A key innovation is that we used the real-world demolition and construction agenda of the municipality of Leiden to quantify and match building material flows on a year-to-year basis Our findings indicate a considerable potential for the recycling of demolition waste The yearly demand for construction materials in our case study can be lowered by around 41% with the use of demolition waste, falling just short of the Dutch policy goal of 50%. Furthermore, around 66% of the generated demolition waste can be recycled and imple-
[[[ p. 11 ]]]
[Summary: This page states that around 66% of available demolition waste can be recycled in new buildings from 2019-2030. It includes a figure matching construction material supply and demand. It concludes that the Dutch policy goal of reducing primary material demand by 50% is not achieved and discusses improvements needed.]
[Find the meaning and references behind the names: Meet, Vary, Risk, Set, Bio, Next, Close, Need]
Sustainability 2021 , 13 , 653 11 of 14 mented in the construction of new buildings at its EOL. In our case study city, however, the demand for building materials was higher than the supply of secondary materials, enabling higher recycling rates. Crucially, we found that 20% of the demolition waste could not be recycled due to a mismatch in time, where construction material demand occurred in one year and suitable secondary material supply in another The results of this study illustrate the mismatch between the yearly supply of recyclable demolition waste and the demand for building materials. We found that in our municipal-wide case study, the material surpluses and deficits vary strongly per year. Overall, we found that the supply of secondary material is not enough to meet the demand for construction materials. The material losses in the collection and recycling of demolition waste further increase the deficit between the secondary materials availability and the construction material demand. Nevertheless, in some years, for some materials, there were more secondary materials available than required for local construction. We also found that the recycled content potential of construction materials can be a limitation for the recycling of some demolition waste (concrete, brick, gypsum, and aluminum) in a situation where building demolition and construction are more evenly matched than in our case study While most Dutch municipalities do not have the local capacity to recycle their demolition waste, they can ensure the proper processing of this waste. Policy goals on the recycling of demolition waste are set by the Dutch national government, whereas the demolition waste is recycled by commercial companies, leaving the municipalities in an intermediary position. For example, in tenders with construction companies, municipalities can specify requirements regarding the use of secondary materials. Furthermore, the reduction in primary material demand can be used by municipalities as an indicator for circularity. However, a potential alternative measure of the local recycling of demolition waste could focus more on quantifying the recycling of the municipal-wide produced demolition waste. For municipalities, the challenge is to align the interests of the construction and demolition companies to ensure the proper processing of demolition waste, and to increase the demand for recycled materials All this implies that it will be challenging to fully close the Dutch construction and demolition waste cycle. In addition to the potential mismatch in building material supply and demand, historically the extent of construction has generally exceeded the extent of demolition. Furthermore, the increasing demand for more floor space per capita further increases the average material demand for each resident. Even in a situation without additional building stock growth, the collection and recycling process cannot recycle 100% of the generated demolition waste, leading to continued demand for primary materials Dutch legislation for construction materials should be considered as another limiting factor in the recycling of demolition waste is the current. While it is useful to ensure quality standards for new materials, the current legislation never considered the recycling of old demolition waste on a significant scale. Therefore, construction companies regard the use of demolition waste as secondary materials as a potential risk [ 31 ]. New governmental policies are required to focus on retaining material quality while allowing further use of recycled materials as building materials A limitation of this study is the uncertainty of demolition and construction planning We also assumed that the material composition of buildings will remain the same in the next decade, while some future developments will influence the size and composition of these materials stocks. The growing population of the Netherlands will increase the need for housing and consequently all materials. Furthermore, the energy transition drives higher demand for metals and insulation, while bio-based building techniques will increase the share of bio-based materials [ 19 , 40 ]. 5. Conclusions In conclusion, our results show that the current processing of demolition waste in the Netherlands will require significant improvements to achieve the Dutch government’s goal of reducing its construction sectors primary material consumption by 50%. This
[[[ p. 12 ]]]
[Summary: This page concludes that the 50% goal can only be reached if there is enough secondary material supply. It states that new governmental policies are required to stimulate the use of secondary materials and lists authors, funding, data availability, acknowledgements, conflicts of interest, and references.]
[Find the meaning and references behind the names: Di Maria, Van Acker, Files, Natural, Williams, Maria, Cossu, Board, Nederland, Europa, Evidence, Acker, Panel, Read, West, Vienna, Erasmus, Germany, Lederer, Point, Web, Holland, Ind, November, Wish, Kleemann, Fellner, Thank, Author, Schiller]
Sustainability 2021 , 13 , 653 12 of 14 goal can only be reached if there is enough secondary material supply in comparison with the construction material demand. Our case study shows a deficit of demolition waste, enabling high recycling rates. In addition to the recycling of demolition waste, new governmental policies are required to stimulate the use of secondary materials in the construction of buildings. For municipalities, the challenge is to specify requirements for their construction and demolition tenders to ensure proper processing and use of the construction materials. This study may provide a starting point for a country-wide analysis of material stocks and flows and the potential recycling of demolition waste as secondary materials A natural progression of this work is to analyze the impact of future building material composition on the recycling of demolition waste. More broadly, a comparison of the material supply and demand in multiple cities or municipalities could help generate further insight into building stocks and flows and clarify on which scale a circular economy of building materials can operate Supplementary Materials: The following are available online at https://www.mdpi.com/2071-105 0/13/2/653/s 1 . Author Contributions: T.J.V., conceptualization, methodology, formal analysis, software, validation, analysis, writing and editing, visualization; M.L.S., conceptualization, methodology, validation, formal analysis, writing, visualization; E.v.d.V., conceptualization, review and editing, supervision; B.S., conceptualization, writing, review and editing, supervision. All authors have read and agreed to the published version of the manuscript Funding: This work was partially funded by ACCEZ, a collaboration between the Province Zuid- Holland, employers association VNO-NCW West, Leiden University, TU Delft, Erasmus University, and Wageningen Research University Institutional Review Board Statement: Not applicable Informed Consent Statement: Not applicable Data Availability Statement: Data is contained within the article or supplementary material Acknowledgments: The authors would like to thank New Horizon for providing us with knowledge on the circular demolition of buildings. We also wish to thank the municipality of Leiden for sharing their demolition and construction agenda with us for this research Conflicts of Interest: The authors declare no conflict of interest References 1 International Resource Panel. Global Material Flows and Resource Productivity. 2016. Available online: www.resourcepanel.org/ file/423/download?token=Av 9 xJsGS (accessed on 1 November 2020) 2 United Nations Environment. Global Status Report 2017. 2017. Available online: https://www.worldgbc.org/sites/default/ files/UNEP%20188_GABC_en%20%28 web%29.pdf (accessed on 1 November 2020) 3 Copenhagen Resource Institute. Resource Efficiency in the Building Sector. 2014. Available online: https://ec.europa.eu/ environment/eussd/pdf/Resource%20 efficiency%20 in%20 the%20 building%20 sector.pdf (accessed on 1 November 2020) 4 Di Maria, A.; Eyckmans, J.; Van Acker, K. Downcycling versus recycling of construction and demolition waste: Combining LCA and LCC to support sustainable policy making Waste Manag 2018 , 75 , 3–21. [ CrossRef ] [ PubMed ] 5 Cossu, R.; Williams, I.D. Urban mining: Concepts, terminology, challenges Waste Manag 2015 , 45 , 1–3. [ CrossRef ] [ PubMed ] 6 Schiller, G.; Müller, F.; Ortlepp, R. Mapping the anthropogenic stock in Germany: Metabolic evidence for a circular economy Resour. Conserv. Recycl 2017 , 123 , 93–107. [ CrossRef ] 7 European commission. Circular Economy Action Plan. 2017. Available online: https://ec.europa.eu/environment/circulareconomy/implementation_report.pdf (accessed on 3 January 2020) 8 Rijksoverheid. Nederland Circulair in 2050. 2018. Available online: https://www.circulaireeconomienederland.nl/rijksbreed+ programma+circulaire+economie/default.aspx (accessed on 1 November 2020) 9 Municipality of Leiden. Strategie Duurzaam Leiden. 2019. Available online: https://www.gagoed.nl/uploads/1904034_GD_ ECWD_Circulaire-economie-Leiden-2020-2023_web.pdf (accessed on 1 November 2020) 10 Kleemann, F.; Lederer, J.; Rechberger, H.; Fellner, J. GIS-based analysis of vienna’s material stock in buildings J. Ind. Ecol 2017 , 21 , 368–380. [ CrossRef ]
[[[ p. 13 ]]]
[Summary: This page primarily contains the references cited in the study, listing authors, publication years, and other relevant details for each source. The references cover a range of topics related to material flows, recycling, construction waste management, and circular economy principles.]
[Find the meaning and references behind the names: Di Maio, Van Vuuren, Zhang, Amati, Art, Chinese, Mol, Jim, Sugimoto, Resources, Wiley, Lock, Sum, Dong, Eds, Raw, Gas, Seed, Reader, Belgium, Eco, Wang, Woolley, Int, Sci, Tam, Base, Sibley, Inf, Maio, Giordano, Pii, Broadbent, Xicotencatl, Paris, Gebremariam, August, Hendriks, Nez, Grade, Vrancken, Srm, State, Cost, Prod, Ronzani, Rivero, Abs, France, Chester, Hashimoto, Borin, April, Pietersen, Wainwright, Forlin, March, Miranda, Reck, Reyna, Geo, Yang, Baars, Navarro, Allwood]
Sustainability 2021 , 13 , 653 13 of 14 11 Ortlepp, R.; Gruhler, K.; Schiller, G. Materials in Germany’s domestic building stock: Calculation model and uncertainties Build Res. Inf 2018 , 46 , 164–178. [ CrossRef ] 12 Heeren, N.; Fishman, T. A database seed for a community-driven material intensity research platform Sci. Data 2019 , 6 , 23 [ CrossRef ] 13 Marinova, S.; Deetman, S.; Van Der Voet, E.; Daioglou, V. Global construction materials database and stock analysis of residential buildings between 1970–2050 J. Clean. Prod 2020 , 247 , 119146. [ CrossRef ] 14 Deetman, S.; Marinova, S.; Van Der Voet, E.; Van Vuuren, D.P.; Edelenbosch, O.; Heijungs, R. Modelling global material stocks and flows for residential and service sector buildings towards 2050 J. Clean. Prod 2020 , 245 , 118658. [ CrossRef ] 15 Müller, D. Stock dynamics for forecasting material flows—Case study for housing in The Netherlands Ecol. Econ 2006 , 59 , 142–156. [ CrossRef ] 16 Heeren, N.; Hellweg, S. Tracking construction material over space and time: Prospective and geo-referenced modeling of building stocks and construction material flows J. Ind. Ecol 2018 , 23 , 253–267. Available online: https://onlinelibrary.wiley.com/doi/abs/ 10.1111/jiec.12739 (accessed on 14 August 2018). [ CrossRef ] 17 Hu, M.; van der Voet, E.; Huppes, G. Dynamic material flow analysis for strategic construction and demolition waste management in Beijing J. Ind. Ecol 2010 , 14 , 440–456. [ CrossRef ] 18 Hu, M.; Pauliuk, S.; Wang, T.; Huppes, G.; Van Der Voet, E.; Müller, D.B. Iron and steel in Chinese residential buildings: A dynamic analysis Resour. Conserv. Recycl 2010 , 54 , 591–600. [ CrossRef ] 19 Ostermeyer, Y.; Nägeli, C.; Heeren, N.; Wallbaum, H. Building inventory and refurbishment scenario data-base development for Switzerland J. Ind. Ecol 2018 , 22 , 629–642. [ CrossRef ] 20 Mastrucci, A. Geospatial Characterization of Building Material Stocks for the Life Cycle Assessment of End-of-Life Scenarios at the Urban Scale. 2017. Available online: https://reader.elsevier.com/reader/sd/B 16 D 0 B 11 DD 5 FBEF 27413 C 278 F 5 B 7914 FBF 20 B 6 757 DA 19811 A 606206680970861716 DDE 205 D 56374 E 7 F 685 C 0 DD 969 F 0 AF (accessed on 16 August 2018) 21 Tanikawa, H.; Fishman, T.; Okuoka, K.; Sugimoto, K. The weight of society over time and space: A comprehensive account of the construction material stock of Japan, 1945–2010 J. Ind. Ecol 2015 , 19 , 778–791. [ CrossRef ] 22 Tanikawa, H.; Hashimoto, S. Urban stock over time: Spatial material stock analysis using 4 d-GIS Build. Res. Inf 2009 , 37 , 483–502 [ CrossRef ] 23 Miatto, A.; Schandl, H.; Forlin, L.; Ronzani, F.; Borin, P.; Giordano, A.; Tanikawa, H. A spatial analysis of material stock accumulation and demolition waste potential of buildings: A case study of Padua Resour. Conserv. Recycl 2019 , 142 , 245–256 [ CrossRef ] 24 Reyna, J.L.; Chester, M.V. The growth of urban building stock: Unintended lock-in and embedded environmental effects J. Ind Ecol 2015 , 19 , 524–537. [ CrossRef ] 25 Mohajerani, A. Practical Recycling Applications of Crushed Waste Glass in Construction Materials: A Review|Elsevier Enhanced Reader. 2017. Available online: https://reader.elsevier.com/reader/sd/pii/S 0950061817318068?token=8 A 1497 C 22 D 07923 DF 2 7 BCAA 3 E 6 BA 56 A 04 D 4 C 70 E 6 AD 243 F 9 C 36 C 41 F 5 E 95 E 6 AE 14 E 26595 F 045 B 14014955 A 9 E 0 E 8 F 8250 FC (accessed on 4 March 2020) 26 Vrancken, K.C.; Laethem, B. Recycling options for gypsum from construction and demolition waste. In Waste Materials in Construction ; Woolley, G.R., Goumans, J.J.J.M., Wainwright, P.J., Eds.; Elsevier: Mol, Belgium, 2007; Volume 1, pp. 325–331 Available online: http://www.sciencedirect.com/science/article/pii/S 0713274300800458 (accessed on 6 May 2020) 27 Zhang, C.; Hu, M.; Dong, L.; Gebremariam, A.; Miranda-Xicotencatl, B.; Di Maio, F.; Tukker, A. Eco-efficiency assessment of technological innovations in high-grade concrete recycling Resour. Conserv. Recycl 2019 , 149 , 649–663. [ CrossRef ] 28 Graedel, T.; Allwood, J.; Birat, J.-P.; Buchert, M.; Hagelüken, C.; Reck, B.K.; Sibley, S.F.; Sonnemann, G. What do we know about metal recycling rates? J. Ind. Ecol 2011 , 15 , 355–366. [ CrossRef ] 29 Kadaster. BAG Nederland. 2018. Available online: https://bagviewer.kadaster.nl/lvbag/bag-viewer/index.html (accessed on 9 April 2019) 30 International Resource Panel. Recycling Rates of Metals. 2011. Available online: https://www.resourcepanel.org/reports/ recycling-rates-metals (accessed on 1 November 2020) 31 Baars, M. Personal Communication with Demolition Company about the Processing of Demolition Waste. Available online: https://www.wbdg.org/resources/construction-waste-management (accessed on 1 November 2020) 32 Zhang, C.; Hu, M.; Yang, X.; Amati, A.; Tukker, A. Life cycle greenhouse gas emission and cost analysis of prefabricated concrete building façade elements J. Ind. Ecol 2020 , 24 , 1016–1030. Available online: https://onlinelibrary.wiley.com/doi/abs/10.1111/ jiec.12991 (accessed on 5 March 2020). [ CrossRef ] 33 Tam, V.W.; Tam, C. A review on the viable technology for construction waste recycling Resour. Conserv. Recycl 2006 , 47 , 209–221 [ CrossRef ] 34 Hendriks, C.F.; Pietersen, H.S Report 22: Sustainable Raw Materials: Construction and Demolition Waste—State-of-the-Art Report of RILEM Technical Committee 165-SRM ; RILEM Publications: Paris, France, 2000; p. 224 35 Jim é nez Rivero, A.; Sathre, R.; Garc í a Navarro, J. Life cycle energy and material flow implications of gyp-sum plasterboard recycling in the European Union Resour. Conserv. Recycl 2016 , 108 , 171–181. [ CrossRef ] 36 Broadbent, C. Steel’s recyclability: Demonstrating the benefits of recycling steel to achieve a circular economy Int. J. Life Cycle Assess 2016 , 21 , 1658–1665. [ CrossRef ]
[[[ p. 14 ]]]
[Summary: This page continues the list of references, citing sources related to metal recycling, solid-state recycling techniques of aluminum, circularity in the built environment, and metal requirements of low-carbon power generation. These references support the study's analysis of material flows and recycling potential.]
[Find the meaning and references behind the names: Van Oers, Kleijn, Kramer, Low, Ellen, Power, Carbon, Giesen, Shamsudin, Mcarthur, Zhong]
Sustainability 2021 , 13 , 653 14 of 14 37 Shamsudin, S.; Lajis, M.; Zhong, Z.W. Evolutionary in Solid State Recycling Techniques of Aluminium: A review Procedia CIRP 2016 , 40 , 256–261. [ CrossRef ] 38 Reck, B.K.; Graedel, T.E. Challenges in metal recycling Science 2012 , 337 , 690–695. Available online: https://www.mmta.co.uk/ wp-content/uploads/2015/01/Science-Challenges-in-Metal-Recycling-Graedel-and-Reck-2012.pdf (accessed on 2 January 2020) [ CrossRef ] 39 Ellen McArthur Foundation. Circularity in the Built Environment. 2016. Available online: https://www.ellenmacarthurfoundation. org/assets/downloads/Built-Env-Co.Project.pdf (accessed on 1 November 2020) 40 Kleijn, R.; van der Voet, E.; Kramer, G.J.; van Oers, L.; van der Giesen, C. Metal requirements of low-carbon power generation Energy 2011 , 36 , 5640–5648. [ CrossRef ]
Other Environmental Sciences Concepts:
Discover the significance of concepts within the article: ‘Matching Demolition and Construction Material Flows, an Urban Mining Case Study’. Further sources in the context of Environmental Sciences might help you critically compare this page with similair documents:
Construction, Material properties, End of life, Conflict of interest, Residential building, Building material, Real world, Material quality, Case study, Global demand, Circular economy, Sustainability, Built environment, Governmental policies, Structural material, Construction and demolition waste, Available data, Urban region, Recycling, Annual basis, Policy goal, Data point, Demolition waste, Recycling rate, GIS data, Construction sector, Building type, Recycled Materials, Sankey diagram, Construction material, Material flow, Construction Waste, Construction companies, Building typology, Recycling potential, Building stock, Demolition, Urban mining, Primary material, Material demand, Circular Economy Action Plan, Building material stocks, Python script, Building floor area, Secondary material.
