Sustainability is an international, open-access, peer-reviewed journal focused on all aspects of sustainability—environmental, social, economic, technical, and cultural. Publishing semimonthly, it welcomes research from natural and applied sciences, engineering, social sciences, and humanities, encouraging detailed experimental and methodological r...

Risk Management Maturity Model for Logistic Processes

Author(s):

Agnieszka A. Tubis
Faculty of Mechanical Engineering, Wroclaw University of Science and Technology, 50-371 Wroclaw, Poland
Sylwia Werbińska-Wojciechowska
Faculty of Mechanical Engineering, Wroclaw University of Science and Technology, 50-371 Wroclaw, Poland


Download the PDF file of the original publication


Year: 2021 | Doi: 10.3390/su13020659

Copyright (license): Creative Commons Attribution 4.0 International (CC BY 4.0) license.


[[[ p. 1 ]]]

[Summary: This page introduces a study on a Risk Management Maturity Model for Logistic Processes. It provides the article's citation, publication details, and copyright information. The abstract highlights the growing interest in maturity models for risk management and introduces a new risk maturity assessment area: cooperation at risk.]

sustainability Article Risk Management Maturity Model for Logistic Processes Agnieszka A. Tubis * and Sylwia Werbi ´nska-Wojciechowska Citation: Tubis, A.A.; Werbi ´nska-Wojciechowska, S. Risk Management Maturity Model for Logistic Processes Sustainability 2021 , 13 , 659. https://doi.org/ 10.3390/su 13020659 Received: 2 December 2020 Accepted: 8 January 2021 Published: 12 January 2021 Publisher’s Note: MDPI stays neutral with regard to jurisdictional claims in published maps and institutional affiliations Copyright: © 2021 by the authors. Licensee MDPI, Basel, Switzerland This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https:// creativecommons.org/licenses/by/ 4.0/). Faculty of Mechanical Engineering, Wroclaw University of Science and Technology, 50-371 Wroclaw, Poland; sylwia.werbinska@pwr.edu.pl * Correspondence: agnieszka.tubis@pwr.edu.pl; Tel.: +48-713-203-427 Abstract: Recently, the maturity models for risk management are attracting growing attention. The obtained maturity level defines an assessment of an organization’s management competence. Therefore, as a set of various tools and practices, the maturity model is critical for a company’s overall risk maintenance strategy development and implementation. Thus, the purpose of this article is to present a model for risk management maturity for logistic processes. We investigated the main defined assessment areas for risk maturity model implementation in logistic systems. Based on research findings, we introduced a new risk maturity assessment area based on participation in the supply chain—cooperation at risk. The proposed model constitutes the base for a two-stage assessment method implementation, where the global maturity index is introduced. Finally, we implement the proposed two-stage assessment method to verify the proposed model’s diagnostic function and determine its labor intensity. The study confirmed that the five defined maturity areas (knowledge, risk assessment, process risk management, cooperation at risk, and risk monitoring) provide a complex diagnostic tool for risk maturity level identification and, based on the obtained results, allows to define an appropriate development strategy for a given decision-making environment Keywords: risk management; maturity model; logistic processes 1. Introduction Following M. Porter’s classification [ 1 ], logistics processes are the necessary processes that have crucial importance for today’s proper performance. In industrial systems, they determine the efficiency and cost of material flow along supply chains. It is also increasingly pointed out that this business activity area determines companies’ competitiveness and even the entire supply chain’s competitive advantage. Enterprises currently operate in conditions in which every business entity has access to the same technological solutions That is why the technological advantage of enterprises is mentioned less and less often. Therefore, the product brand and its market position are primarily built through the reliability of delivery carried out in accordance with the level of logistics service required by the customer [ 2 ]. The requirement of deliveries meeting high logistics service parameters makes companies have little or no margin for making mistakes or reacting with a delay to situations disrupting the correct course of the performed processes. Additionally, dynamic market changes of both regional and global nature make logistic processes more and more vulnerable to various types of undesired events occurrence, to which the company has to adapt quickly. The delivery system’s response time to the disruptions resulting from undesired events occurrence and, above all, the time of its return to the required service level are determined by the managers’ skills responsible for managing the logistics processes in the company [ 3 ]. Following this, the changing business environment and logistical process management approach have forced introducing concepts, such as logistic risk, system resilience, and process vulnerability, into logistics terminology [ 4 ]. All three concepts need to be defined for the presented research results Sustainability 2021 , 13 , 659. https://doi.org/10.3390/su 13020659 https://www.mdpi.com/journal/sustainability

[[[ p. 2 ]]]

[Summary: This page defines logistic risk, vulnerability, and resilience based on publications by Profs. Aven and Bukowski. It outlines the goals of risk management according to COSO, emphasizing the need for tools like Risk Management Maturity Models (RMMM) to assess and improve risk management implementation. It highlights the focus on risk management in logistics processes.]

Sustainability 2021 , 13 , 659 2 of 19 There is no comprehensive definition of the above concepts. The definitions adopted in this study are based on recent publications by Prof. Aven (see refs. [ 5 – 8 ]) and Prof. Bukowski (see refs. [ 9 , 10 ]). Following this, we may define logistic risk as a potential possibility of an undesired event occurrence that will enable the logistic system to achieve delivery parameters regarding time, place, quantity, and quality at an assumed level (declared logistical service level). In this respect, a logistic system’s vulnerability means a decrease in the level of logistics service performance resulting from the logistics system’s response to an adverse event occurrence. Finally, the resilience of a logistics system, as opposed to its vulnerability, is defined as the system’s potential ability to achieve the assumed level of logistics service performance after the occurrence of an undesired event while maintaining cost limits At the same time, it should be noted that the increasing market expectations for shortening the reaction time of logistics systems to disruptions in supply chains cause an increased emphasis on the implementation of the risk management concept in logistics processes. This management, according to COSO (Committee of Sponsoring Organizations of the Treadway Commission) [ 11 ], aims for: (1) Identification of potential events that may affect the organization; (2) keeping risks within established limits; (3) reasonably ensuring the achievement of the organization’s objectives. The better the company manages the risks associated with its operations, the better it is prepared for potential adverse events that may occur in its processes. Moreover, the better it is prepared for adverse events, the shorter the reaction time, and the faster the return to the standard of service offered before the event occurrence The development of the risk management concept caused the need to create tools that (a) will allow the company to assess the current level of implementation of specific solutions supporting the process of dealing with adverse events and (b) indicate the direction of further development/changes, which will allow the processes resilience to disruptions to be strengthened. The most popular tool supporting both of these areas is the Risk Management Maturity Model (RMMM). This tool will be described in detail in Section 2 . However, at the outset, it should be made clear that according to [ 12 ], the risk maturity models are typically qualitative models, which aim to describe the current state of implementation of the Enterprise Risk Management (ERM), and typically consist of attributes which are intended to describe the essential characteristics for the ERM such as management’s commitment to risk management (RM). Different maturity stages are assigned to the attributes to describe the level of progress. As can be seen from the above definition, risk management maturity models refer to Enterprise Risk Management concepts and therefore relate to general business assumptions implemented at the enterprise management level. This observation is also confirmed by other publications indicated in Section 2 of the article, which show that the described Risk Management Maturity (RMM) models are primarily used for the global assessment of enterprise maturity or project management In our research, the authors focus on the specificity of risk management in logistics processes. This risk management area in an enterprise is incredibly demanding, as logistic processes are carried out at the interface of links in the supply chains. That makes them more vulnerable to various types of disruptions, the source of which is internal and most of all external factors beyond the organization’s control. For this reason, risk management in this area of the company’s operations is particularly challenging and requires taking into account specific aspects of planning, organizing, and implementing logistics processes The inter-organizational nature of logistics operations and their importance in assessing the competitiveness of the delivered products and services should also be reflected in dedicated tools for assessing risk management’s maturity. RMM models described in the literature focus primarily on the aspects related to intra-organizational solutions focused on risk management. In models dedicated to logistics processes, one should also focus on aspects related to the possibility of risk management within the entire supply chain. For this reason, this article aims to present the risk management maturity model in

[[[ p. 3 ]]]

[Summary: This page outlines the main contributions of the study, including defining assessment areas for risk management maturity in logistic processes, introducing cooperation at risk, proposing a 5-grade maturity assessment scale, and introducing a two-stage assessment method. It also describes the structure of the article and its verification against the classic approach.]

Sustainability 2021 , 13 , 659 3 of 19 logistics processes and its verification against the classic approach, based on the example of implementation at a selected manufacturer from the automotive sector Following this, the main contribution of this study is that: • We have defined assessment areas for risk management maturity, which are essential for logistic processes performance • We have introduced a new risk maturity assessment area based on participation in the supply chain–cooperation at risk • We propose a 5-grade maturity assessment scale to define the risk assessment maturity achieved by an organization dedicated to logistic processes • We introduce a two-stage assessment method to assess the risk based on the global maturity index’s average level • Finally, we implement the proposed two-stage assessment method to verify the proposed model’s diagnostic function and determine its labor intensity Therefore, the article structure includes, apart from the Introduction, a detailed review of the literature in the area of risk management and assessment. Moreover, business maturity modeling issues are investigated. Next, a proposed model of assessing the maturity of risk management in logistic processes is presented. The developed maturity assessment model includes five main assessment areas, including knowledge, risk identification and analysis, risk response, risk monitoring, and cooperation at risk. The described model has been implemented in the selected production company from the automotive industry. Based on the analyzed case study, a diagnosis of the current maturity level was made based on the two selected approaches—the classical RMM approach and the proposed extended RMM approach. The whole work is summarized in the form of conclusions and the identification of further directions of the authors’ research work 2. Literature Review The proposed research is closely related to two research areas: Risk management and organization maturity modeling. The authors briefly review the key literature in each of these areas related to supply chain performance in the following section 2.1. Supply Chain Risk Management Supply chain risk and resilience issues have become a field of research over the past 20 years. The growing interest in supply chain risk and resilience issues may be confirmed by the results of the Supply Chain Resilience Reports in which the challenges of developing resilient supply chains have been considered since 2008 (see, e.g., [ 13 – 15 ]). The reports highlight the level, range, and cost of disruptions those organizations face and demonstrate how a disruption in one organization can spread out over the entire supply chain [ 15 ]. Moreover, many definitions have been developed in known scientific works due to the plethora of studies on supply chain risk management. A summary and review of the existing definitions are presented, e.g., in [ 16 ]. In another work [ 17 ], the authors classify existing literature on risk sources’ typology, including environmental factors, industry factors, organizational factors, problem-specific factors, and the decision-making process. Moreover, the analysis of designing supply chains in the aspect of the decision-making process affected by uncertainty and risk is presented in work [ 18 ]. The paper presents a review of the literature analyzing the possibilities of using selected quantitative methods in the aspect of analysis and assessment of various types of risk as well as measures assessing the resilience of chains. Additionally, recent literature reviews on supply chain risk management are provided, e.g., in works [ 19 – 24 ]. The problems of supply chain disruptions management are analyzed, e.g., in [ 25 ], where the relationship between detection of a disruption event, causes of an event, and recovery performance were reviewed. This problem was also analyzed in [ 26 ] from the decision-making process perspective. The author developed propositions for social, psychological, environmental, organizational, and individual factors that drive the idiosyncratic nature of supply disruption risk decision-making. A comprehensive review of supply

[[[ p. 4 ]]]

[Summary: This page continues the literature review, focusing on risk mitigation strategies and the analysis of risks caused by supplier disruptions. It mentions approaches like HAZOP and bow-tie diagrams. It then transitions to the topic of Organizations’ Maturity Modeling, defining maturity and its role in assessing achievement of goals.]

Sustainability 2021 , 13 , 659 4 of 19 chain risk sources is given in [ 27 ]. The authors also provided a short investigation of the link between those supply chain risk sources and supply chain performance The influence of different risk conditions on supply chain risk management strategies was analyzed in [ 28 ]. The authors focused on widely acknowledged risk management approaches as postponement and speculation and highlighted the dangers of functionally isolated decision making Risk mitigation strategies were under investigation, e.g., in works [ 29 ]. In [ 29 ], the authors review supply chain decision-making from a system perspective. They focused on green supply chain management, supply chain risk, and supply chain efficiency issues. In the second work [ 30 ], the authors proposed supply chain risk mitigation strategies in the presence of a variety of risk categories, risk sources, and supply chain configurations Another interesting problem was analyzed in [ 31 ]. The authors focused on the investigation of supply chain uncertainty for delayed supply chain project investments. They analyzed six main options–unlocking, stage, scale, switch use, deferral, and abandonment in the frame of decision-making theory In another work [ 32 ], the authors analyzed risks caused by supplier disruptions using the probabilistic risk assessment approach. Moreover, scientific work may be found focused on, e.g., HAZOP-based (Hazard and Operability Studies) approach implementation [ 33 ], or bow-tie diagrams use [ 34 ]. The problem of monitoring key risk indicators is investigated, e.g., in [ 35 ]. Supply chain risk management can be analyzed regarding maturity modeling issues 2.2. Organizations’ Maturity Modeling The term “maturity” may be defined as a state of being complete, perfect, or ready; a fullness of development [ 36 ]. Simultaneously, a maturity model is usually defined as a structured set of elements that describes an evolutionary path of improvement from immature processes to mature, effective, and qualitatively better processes [ 36 ]. The main idea beyond any maturity model is to assess the level of achievement of identified goals or expected results. Maturity can also show the preparedness to set new business challenges and development [ 37 ]. Therefore, the maturity model is a set of various tools and practices that enable the assessment of an organization’s management competence [ 38 ], as well as the improvement of key factors leading to the achievement of the assumed objectives [ 39 ]. The OMG (Object Management Group) defines maturity models as an evolutionary process of implementing key practices in one or more areas of company performance [ 40 ]. Thus, the model determines the current state of an organization, which results from: • The way it operates; • The possibility of using its resources or previous experience; • The objectives that can be achieved in the future by setting priorities for actions and identifying the means and ways of their implementation The adopted levels of maturity allow the organization to improve its practices, starting from undefined and inconsistent practices and processes, through practices that are repetitive at the level of organizational units, to comprehensively defined business processes (predictable and statistically managed), to the continuous process of innovation implementation and optimization [ 40 ]. The maturity model, therefore, has two functions–diagnostic and planning. First, it is used to assess the organization’s competencies by determining the level of implementation of individual solutions and practices and, consequently, assessing the organization’s strengths and weaknesses. Next, the same tool allows the decision-makers to show the way of development by determining the scope of activities and changes, which is necessary to increase the maturity level [ 41 ]. Two approaches are distinguished in assessing maturity: Fixed and continuous representation [ 42 ]. In the fixed representation, each level of maturity is assigned a specific number of process areas, whose implementation in a given organization allows a specific level of maturity to be achieved. In this approach, the principle of aggregation applies.

[[[ p. 5 ]]]

[Summary: This page further elaborates on organizations maturity modeling, highlighting the diagnostic and planning functions of maturity models. It distinguishes between fixed and continuous representation approaches. It also mentions recent maturity models used for assessment of performance levels of business organizations and supply chain management maturity models.]

Sustainability 2021 , 13 , 659 5 of 19 Achieving a given level of maturity means a positive assessment of all process areas from a given level. The improvement of the organization is, therefore, of an incremental nature The improvement process is carried out based on a schedule of activities, which defines the designated practices necessary to be implemented to achieve the target level of maturity in the future. Continuous representation makes it possible to improve selected process areas that are critical to the organization. In the process of improvement, each process area is assessed individually according to the adopted maturity scale; therefore, the organization gains excellent flexibility in selecting activities. The selection of implemented practices from a selected area depends on the resources available and the adopted development goals The main differences in fixed and continuous representation are presented in Figure 1 . Recently, there are many maturity models used for the assessment of performance levels of business organizations. The discussion about maturity models concerning the application section was provided, e.g., in [ 43 ], where the authors identified 200 maturity models and later analyzed them, taking into account validity tests. Moreover, the literature review on the evaluation of maturity models was developed in [ 44 ]. The authors classified the existing models into six categories: the maturity model evaluation, type of evaluation, a relation of the evaluators/authors to the maturity model, level of objectivity, the primary purpose of the paper, and the study’s size. A short comparison of the chosen models was provided, e.g., in [ 45 ], where the authors established differences and similarities between the maturity levels (and their processes) described in the analyzed models. In turn, enterprise maturity models are reviewed in [ 46 ], where maturity alignment was widely investigated Sustainability 2021 , 13 , x FOR PEER REVIEW 5 of 20 quently, assessing the organization’s strengths and weaknesses. Next, the same tool allows the decision-makers to show the way of development by determining the scope of activities and changes, which is necessary to increase the maturity level [41]. Two approaches are distinguished in assessing maturity: Fixed and continuous representation [42]. In the fixed representation, each level of maturity is assigned a specific number of process areas, whose implementation in a given organization allows a specific level of maturity to be achieved. In this approach, the principle of aggregation applies. Achieving a given level of maturity means a positive assessment of all process areas from a given level. The improvement of the organization is, therefore, of an incremental nature. The improvement process is carried out based on a schedule of activities, which defines the designated practices necessary to be implemented to achieve the target level of maturity in the future. Continuous representation makes it possible to improve selected process areas that are critical to the organization. In the process of improvement, each process area is assessed individually according to the adopted maturity scale; therefore, the organization gains excellent flexibility in selecting activities. The selection of implemented practices from a selected area depends on the resources available and the adopted development goals. The main differences in fixed and continuous representation are presented in Figure 1. Recently, there are many maturity models used for the assessment of performance levels of business organizations. The discussion about maturity models concerning the application section was provided, e.g., in [43], where the authors identified 200 maturity models and later analyzed them, taking into account validity tests. Moreover, the literature review on the evaluation of maturity models was developed in [44]. The authors classified the existing models into six categories: the maturity model evaluation, type of evaluation, a relation of the evaluators/authors to the maturity model, level of objectivity, the primary purpose of the paper, and the study’s size. A short comparison of the chosen models was provided, e.g., in [45], where the authors established differences and similarities between the maturity levels (and their processes) described in the analyzed models. In turn, enterprise maturity models are reviewed in [46], where maturity alignment was widely investigated. Figure 1. Scheme of fixed and continuous representation of organization maturity [47]. According to [37], the idea of a mature organization in a supply chain may be understood as engagement in extensive collaboration across a wide arc of supply chain partners in order to implement appropriate integrative practices. One of the recent literature reviews on supply chain management maturity models was developed in [48]. A summary of supply chain management maturity models was given in [49]. Furthermore, maturity Figure 1. Scheme of fixed and continuous representation of organization maturity [ 47 ]. According to [ 37 ], the idea of a mature organization in a supply chain may be understood as engagement in extensive collaboration across a wide arc of supply chain partners in order to implement appropriate integrative practices. One of the recent literature reviews on supply chain management maturity models was developed in [ 48 ]. A summary of supply chain management maturity models was given in [ 49 ]. Furthermore, maturity models in supply chain sustainability were reviewed in [ 50 ] and analyzed in [ 37 ]. The study on the assessment of the company’s maturity level of Logistics 4.0 implementation was presented, e.g., in [ 51 ], and the innovation maturity model in logistics was introduced in [ 52 ] Moreover, the problems of maturity differences in supply chains between customers and suppliers were of interest to the paper’s authors [ 53 ]. A maturity test for supply chain operations was investigated in [ 54 ]. Risk management maturity models were reviewed, e.g., in [ 55 ]. The authors analyzed the main attributes of the existing maturity models and provided a comparison of maturity measurement levels of different models that may be implemented in construction organizations.

[[[ p. 6 ]]]

[Summary: This page introduces the methodology used in the study, formulating research questions related to risk management maturity assessment in logistics processes. It identifies areas of maturity assessment based on a review of RMM models and verifies them with logistics specialists. It presents the identified areas and their frequency of occurrence.]

Sustainability 2021 , 13 , 659 6 of 19 3. Methodology During the performance of risk management maturity assessment analyses in logistics processes, we formulated the following research questions: • RQ 1. What areas of risk management should be the subject of maturity studies in relation to logistics processes based on classic RMM ERM models? • RQ 2. How to additionally take the inter-organizational nature of logistics processes into account in the risk management maturity study? • RQ 3. How do we identify risk area characteristics at maturity levels? • RQ 4: How should the risk management maturity assessment process be conducted in logistics processes? • RQ 5. Will the developed RMM model’s application affect the risk management maturity assessment performed in the selected organization? Based on the review of RMM models presented in [ 56 ], areas for assessing the maturity of risk management have been identified, which so far have been included in the models presented by various authors. These areas, together with the number of occurrences, are presented in Figure 2 . Based on the mind map analysis, eight areas of maturity assessment were identified, which most often appear in the models described in the literature, i.e., culture, process, experience, application, risk identification, risk analysis, risk response, management capabilities in relations to risk. The risk management maturity assessment areas identified based on literature studies were verified with logistics specialists’ information needs. The research was carried out as part of training courses on “risk management in logistics processes,” which logistics managers attended from enterprises representing various economic sectors. The training participants were asked to indicate which areas assessed in classic RMM models should be the subject of maturity studies to assess logistics processes. A total of 46 managers took part in the survey. The most frequently indicated areas are presented in Figure 3 . The surveys of managers’ opinions have not been of a purely statistical nature The obtained results have been aimed at a preliminary verification of the assumptions made in the adopted methodology Sustainability 2021 , 13 , x FOR PEER REVIEW 7 of 20 Figure 2. Areas of RMM described in the known literature. Figure 3. Areas selected by logistics managers to assess the maturity of risk management in logistics processes. 0 5 10 15 20 25 30 35 40 45 50 Experience / Knowledge Risk identification and analysis Risk response / management Risk monitoring Information and communication Risk documentation Culture Number of indications Figure 2. Areas of RMM described in the known literature.

[[[ p. 7 ]]]

[Summary: This page continues to describe the research methodology. It presents the areas selected by logistics managers to assess the maturity of risk management in logistics processes. Based on both research studies, four leading assessment areas have been defined for the risk management maturity model, which takes into account the specificity of logistics processes]

Sustainability 2021 , 13 , 659 7 of 19 Sustainability 2021 , 13 , x FOR PEER REVIEW 7 of 20 Figure 2. Areas of RMM described in the known literature. Figure 3. Areas selected by logistics managers to assess the maturity of risk management in logistics processes. 0 5 10 15 20 25 30 35 40 45 50 Experience / Knowledge Risk identification and analysis Risk response / management Risk monitoring Information and communication Risk documentation Culture Number of indications Figure 3. Areas selected by logistics managers to assess the maturity of risk management in logistics processes Based on both conducted research studies, four leading assessment areas have been defined for the risk management maturity model, which takes into account the specificity of logistics processes: 1 Experience/knowledge : It should be taken into account that in an interview with logistics managers, the participants stressed the importance of the experience and registered/formalized knowledge of established events 2 Risk identification and analysis : Taking primarily the methods and scope of conducted risk analyses for logistics processes into account 3 Risk process management/Risk response : Determining the degree of use of the results of conducted risk analyses in the process of planning material and information flows, as well as the process management itself, taking into account their limitations and unwanted events 4 Risk monitoring : Understood as monitoring the correctness and effectiveness of logistic processes and achieving the assumed logistic standards The indicated areas of maturity assessment are in line with the patterns described in the literature on RMM models. However, as noted in the Introduction, logistic systems have specificity in operating at several organizations’ interaction. Therefore, when developing a maturity assessment tool for risk management in logistic processes, their cooperative nature should be considered. Therefore, the proposed model, LRMM (Logistic Risk Management Maturity), includes the concept of Collaborative Risk Management This concept is primarily concerned with “the capacity of organizations, societies, and countries to coordinate and join efforts, prior to, during, and after major incidents, in an attempt to prevent or, at least mitigate adverse consequences through effective utilization of technology, unique leadership, teamwork, and communications” [ 57 ]. Based on this, the fifth area of assessing risk management’s maturity, namely cooperation at risk, has been established In determining the number of maturity levels for the model developed, the literature review prepared by [ 56 ] was used again. The described maturity models were mostly based on a 4–or 5-grade assessment scale. They analyze the implementation path for reaching full maturity for risk management in logistics processes. Therefore the authors also decided to use a 5-stage assessment scale. For each of the five identified maturity areas, the risk management system’s characteristics were therefore determined, as shown in Table 1 .

[[[ p. 8 ]]]

[Summary: This page presents a table outlining the characteristics of global maturity levels for risk management systems in logistics processes across five areas: knowledge, risk identification and analysis, risk response, and risk monitoring. Each area is defined across five levels: Poor, Basic, Good, Satisfactory and Excellent.]

Sustainability 2021 , 13 , 659 8 of 19 Table 1. Characteristics of global maturity levels of risk management system in logistics processes Areas Poor–1 Basic–2 Good–3 Satisfactory–4 Excellent–5 Knowledge Lack of systematic knowledge about the operation of logistic processes and occurring disturbances. The employees rely solely on their own experience. Lack of knowledge of the organization about risks in logistics systems Logistics process managers have the knowledge gained from their team about critical logistics operations and the associated risks. However, this knowledge is not formally recorded in the system Based on collected reports about logistic operations, managers report the most significant adverse events to the system A knowledge base of adverse events is established, taking into account the causes, effects, dates of occurrence, associated factors, and critical logistic operations (in particular their time and space relationships and resources) The knowledge base is regularly updated based on current observations and events. The company also registers in the system sectoral, process, and technical knowledge derived from benchmarking analyses. The knowledge is acquired based on developed reporting tools. The knowledge comes not only from the company’s own experience but also from other external entities. Defined knowledge management principles Risk identification and analysis Lack of identification of undesirable event to the successful operation of logistics processes. No risk assessment, even for the critical delivery processes In the case of undesirable events in critical logistic operations, the risk of their occurrence shall be determined using qualitative tools. The results are communicated to the management board only Risk identification and analysis of logistic processes carried out at the request of the management board. Only a small team of logistics specialists is involved in the performed analyses. Quality tools are mainly used. The results are communicated to the management board and logistics managers Risk analysis is carried out for all logistics processes regularly but at considerable intervals. An evaluation carried out using quantitative and qualitative tools. The results are communicated to the management board and selected managers (not only from the logistics area) A risk assessment carried out on a systematic basis (periodic update of the results obtained). The assessment uses the knowledge of managers from different areas—a team composed of specialists from different areas of the company. The use of advanced quantitative and qualitative risk assessment tools Assessment results are distributed to all units of the organization Risk response Lack of identification of the critical logistics processes. Lack of consideration of occurring limitations or undesired events in the planning processes performance Identified operations that are critical to the correct completion of delivery processes. Modes of emergency execution of critical operations have been identified in the case of undesired events occurrence The results of the conducted analysis are used to plan high-risk logistics processes. Lack of prevention and mitigation actions. Lack of improvement of logistic processes based on the existing risk identification Preventive procedures and scenarios are developed for events with the highest risk level. When planning logistic activities, managers use their knowledge about adverse events and their occurrence possibility The results of the risk assessment are the basis for planning logistics activities. For events with an unacceptable level of risk indicator, preventive measures are developed (reducing the probability of their occurrence), as well as scenarios for dealing with their consequences (reducing the effects of the event occurrence). Based on the results of risk analysis, logistic processes are improved in accordance with the PDCA cycle (Plan-Do-Check_Act).

[[[ p. 9 ]]]

[Summary: This page continues the table outlining the characteristics of global maturity levels for risk management systems in logistics processes across the cooperation at risk area. Each area is defined across five levels: Poor, Basic, Good, Satisfactory and Excellent.]

Sustainability 2021 , 13 , 659 9 of 19 Table 1. Cont Areas Poor–1 Basic–2 Good–3 Satisfactory–4 Excellent–5 Risk monitoring Lack of a system of logistic indicators to monitor the efficiency and effectiveness of performed processes Fundamental logistic indicators that monitor the performance of processes and the results obtained. Lack of use of logistic indicators in the assessment of hazards to the execution of delivery processes Fundamental logistic indicators to monitor the efficiency and effectiveness of performed processes, calculated regularly for reporting purposes, and at the management board’s request. Set standards for indicators to inform about deviations from planned effects achievement level A formalized (integrated with the IT system) system of indicators monitoring the correctness and effectiveness of the implementation of logistic processes and their compliance with the set standards (logistic service standards). Risk analysis in the case of long-term or significant deviations occurrence A comprehensive system of indicators monitoring the correctness and effectiveness of logistic processes, determined regularly based on data reported to the system. Regular analysis and interpretation of deviations from the assumed logistic standards. Exchange of information between departments on significant deviations affecting supply processes and other company processes. Indicators play the role of guards of process correctness Cooperation at risk Lack of exchange of information on adverse events within the company and with business partners For critical events, cooperation between functional areas following the guidelines of the management board Sharing information on adverse events with other functional areas of the company. Internal cooperation in planning high-risk processes. Information on disruptions to business partners Sharing information on adverse events within the company and with strategic partners. Developed emergency scenarios for high-risk adverse events, prepared together with strategic partners Information integration of risks within the company and with business partners. Cooperation with partners in the supply chain in the area of risk reduction. Joint development of preventive measures. Jointly developed emergency response scenarios taking into account the potential and accepted ranges of deviations by partners in the supply chain and distribution channels. Coordinated responses to the occurrence of adverse events.

[[[ p. 10 ]]]

[Summary: This page describes the conducted maturity assessment in accordance with the model of continuous representation. It explains the global index defining the level of an organization’s maturity. It introduces a formula to estimate the average level of maturity. It introduces a scale for assessing the global maturity of the risk management system.]

Sustainability 2021 , 13 , 659 10 of 19 The conducted maturity assessment is in accordance with the model of continuous representation, which not only allows the current level of maturity of the organization to be diagnosed, but also the weak and robust management areas to be identified. Thanks to this, the tool used plays a diagnostic role and enables the determination of further directions for the improvement and development of the assessed system. However, the organizations’ managers also assess management areas in order to determine their position among competitive companies. Therefore, there is a need for a global index defining the level of an organization’s maturity, which will determine its position among enterprises from the sector. Therefore, the analysis of risk management’s maturity based on a 5- area assessment matrix is complemented by determining the logistic risk management maturity indicator. This indicator is calculated based on the organization’s results in each of the analyzed logistic risk assessment areas. The points obtained for particular areas are summed up, and then the average maturity level is calculated. In order to estimate the average level of maturity, the arithmetic mean can be used if all assessed areas have comparable value for managers. However, it is worth considering using a weighted average, which will allow an organization to assign importance to particular areas of risk management in a company and reflect priorities resulting from the adopted operational strategy. Thus, an assessment of the maturity of a risk management system in logistic processes will be estimated according to Formula (1): ML = ∑ n i = 1 A i · ω i ∑ ω i (1) where: ML –the average level of global maturity, the ML need not be an integer, A i –assessment of the maturity of processes in the i th area, ω i –the weight assigned to the i th area, where ∑ ω i = 1, n –number of areas evaluated Due to the use of a weighted average, the result of the global maturity of logistics processes achieved by an organization does not have to be an integer. Therefore, when designing a matrix for assessing the resilience of logistics processes based on risk management maturity, it is reasonable to use a range scale to consider the partial/weighted results obtained. This scale can be modified accordingly, depending on the managers’ preferences responsible for the assessment procedures. Thus, the assessment scale in the second phase of the procedure will take the form presented in Figure 4 . Sustainability 2021 , 13 , x FOR PEER REVIEW 11 of 20 The conducted maturity assessment is in accordance with the model of continuous representation, which not only allows the current level of maturity of the organization to be diagnosed, but also the weak and robust management areas to be identified. Thanks to this, the tool used plays a diagnostic role and enables the determination of further directions for the improvement and development of the assessed system. However, the organizations’ managers also assess management areas in order to determine their position among competitive companies. Therefore, there is a need for a global index defining the level of an organization’s maturity, which will determine its position among enterprises from the sector. Therefore, the analysis of risk management’s maturity based on a 5-area assessment matrix is complemented by determining the logistic risk management maturity indicator. This indicator is calculated based on the organization’s results in each of the analyzed logistic risk assessment areas. The points obtained for particular areas are summed up, and then the average maturity level is calculated. In order to estimate the average level of maturity, the arithmetic mean can be used if all assessed areas have comparable value for managers. However, it is worth considering using a weighted average, which will allow an organization to assign importance to particular areas of risk management in a company and reflect priorities resulting from the adopted operational strategy. Thus, an assessment of the maturity of a risk management system in logistic processes will be estimated according to Formula (1): = ∑ ∙ ∑ (1) where: ML –the average level of global maturity, the ML need not be an integer, –assessment of the maturity of processes in the i th area, –the weight assigned to the i th area, where ∑ = 1 , n –number of areas evaluated. Due to the use of a weighted average, the result of the global maturity of logistics processes achieved by an organization does not have to be an integer. Therefore, when designing a matrix for assessing the resilience of logistics processes based on risk management maturity, it is reasonable to use a range scale to consider the partial/weighted results obtained. This scale can be modified accordingly, depending on the managers’ preferences responsible for the assessment procedures. Thus, the assessment scale in the second phase of the procedure will take the form presented in Figure 4 Figure 4. Scale for assessing the global maturity of the risk management system. Figure 4. Scale for assessing the global maturity of the risk management system.

[[[ p. 11 ]]]

[Summary: This page elaborates on the ML indicator and its non-integer value due to the weighted average. It emphasizes the necessity of considering partial achievement of requirements for each level. It presents a table outlining the characteristics of global maturity levels of risk management system in logistics processes.]

Sustainability 2021 , 13 , 659 11 of 19 As noted previously, the ML indicator is calculated on a weighted average, so its value does not have to be an integer. For this reason, when constructing each level’s global characteristics, it is necessary to consider the partial achievement of the requirements assigned to each level in the assessment areas under consideration. This means that an organization can reach a certain level of maturity determined by the ML indicator without obtaining the maximum rating for that level in all areas of the analyzed logistic risk management (e.g., an organization reaches level 3 according to the ML indicator, although in the detailed assessment process, level 3 was obtained in 4 out of 5 assessed areas) For each ML value, a global characteristic of the organization’s maturity level of logistical risk management has been developed. These characteristics are presented in Table 2 . Table 2. Characteristics of global maturity levels of risk management system in logistics processes Maturity Level Characteristics Level 1: Ad hoc risk management There are no activities aimed at identifying risks in the area of logistic systems performance; no preventive actions, and no reduction of the effects of supply disruptions Lack of risk management rules and procedures in logistic systems operation, due to the occurrence of undesired events, deliveries are executed in a chaotic manner (“ad hoc” management) Level 2: Critical events in logistic system management Developed and implemented procedures for managing critical events in logistic systems. Other possible disruptions are identified, but there are no systematically applied solutions for risk assessment and logistic process performance management. Lack of use of available IT (information technology) tools to gather knowledge and monitor the current implementation of delivery processes. Possible risk reduction is limited to a given logistic process and results from particular logistic managers’ initiative. The competence and commitment of employees determine the success of an organization Level 3: Selective organizational risk management Risk management procedures and rules have been developed but are not implemented in a systemically sound manner. They are known only to a small group of logistic specialists. Risk assessment is supported by information from the IT system (ERP (Enterprise Resource System), WMS (Warehouse Management System)). No continuous monitoring of risks. Delivery risk assessment results support management processes, but only in selected cases. The principles of cross-departmental cooperation (of particular functional areas in the company) are defined in case of undesired events (with a high level of risk) in particular processes occurrence. Qualitative methods are used to identify and assess logistic risk Level 4: Cross-functional supply risk management Risk assessment and management procedures in the logistic system have been developed and implemented systematically. The risk assessment involves representatives of the logistics department and the departments cooperating in handling material and information flows in the company The company collects information on undesirable events systemically occurring in the delivery process and uses it in the planning processes. Selected business partners are involved in risk management processes. In addition to qualitative methods, basic quantitative methods are included in risk identification and assessment. Risk monitoring is based on a defined system of logistic indicators Level 5: Integrated supply risk management Full implementation of all assumed supply risk management tools in a fully integrated system. A system for gathering and using the information following the concept of a learning organization. Continuous improvement of logistics processes based on risk assessment. Full use of the knowledge and experience of logistics staff and external information from supply chain partners. Risk management system based on integration with business partners. Integration of the risk management system with the so-called core business objectives and company management strategy For such a defined model of assessing the maturity of logistic processes risk management, an assessment procedure has been formulated, which includes a 2-stage analysis process: (1) A detailed assessment based on a 5-area assessment matrix and (2) an overall assessment based on the global maturity indicator for operational risk management ML. The

[[[ p. 12 ]]]

[Summary: This page concludes the description of the methodology by outlining the two-stage analysis process: detailed assessment and overall assessment based on the ML indicator. It mentions that the assessment process is the first phase of the diagnostic procedure and is an input to phase 2, consisting of identifying potential areas of improvement for logistic risk management.]

Sustainability 2021 , 13 , 659 12 of 19 assessment process is the first phase of the diagnostic procedure and is an input to phase 2, consisting of identifying potential areas of improvement for logistic risk management. Both phases of the proposed LRMM model are shown in Figure 5 . Sustainability 2021 , 13 , x FOR PEER REVIEW 13 of 20 For such a defined model of assessing the maturity of logistic processes risk management, an assessment procedure has been formulated, which includes a 2-stage analysis process: (1) A detailed assessment based on a 5-area assessment matrix and (2) an overall assessment based on the global maturity indicator for operational risk management ML. The assessment process is the first phase of the diagnostic procedure and is an input to phase 2, consisting of identifying potential areas of improvement for logistic risk management. Both phases of the proposed LRMM model are shown in Figure 5. Figure 5. Assessment and improvement process scheme for the given LRMM model. 4. Results and Discussion The proposed method was used to assess a risk management system's maturity for the selected production company. The company under investigation is a supplier for manufacturers from the automotive sector, located mainly in Poland. The company started as a local family business, supplying several customers located in the region. However, thanks to the commitment and high quality of the service provided, the company has, in recent years, registered a few times increase in its turnover thanks to the acquisition of Figure 5. Assessment and improvement process scheme for the given LRMM model 4. Results and Discussion The proposed method was used to assess a risk management system’s maturity for the selected production company. The company under investigation is a supplier for manufacturers from the automotive sector, located mainly in Poland. The company started as a local family business, supplying several customers located in the region. However, thanks to the commitment and high quality of the service provided, the company has, in recent years, registered a few times increase in its turnover thanks to the acquisition of successive several-year contracts. At present, the company employs about 200 people, with the management staff (upper and middle level) representing about 20% of all employees The company provides products with an uncomplicated technological structure to not compete with the manufactured products’ innovativeness. Therefore, it builds its competitive

[[[ p. 13 ]]]

[Summary: This page introduces the results and discussion section, focusing on the assessment of a risk management system's maturity in a selected automotive supplier. It details the company's background, competitive strategy, and existing risk analysis methods. It also outlines the evaluation procedure used.]

Sustainability 2021 , 13 , 659 13 of 19 advantage based on a high level of logistic service and operational flexibility. To meet the customer service policy’s declared objectives, the management of the company puts great emphasis on the improvement of logistic processes, including the process of material supply and logistic service of the customer order For several years the company has been implementing the concept of risk management in its key business processes. One such area is logistic processes, which determine the competitiveness of the manufacturer’s offer on the serviced market. The risk analysis methods are currently limited to quality tools implementation, which is selected and prepared for implementation by a small group of the CEO’s (chief executive officer) closest associates. The company is a participant in global supply chains. The supply of raw materials is provided by local (national) suppliers, but also global companies from China or European countries (Italy, Spain, Germany). Direct customers of the manufactured products are Polish clients, but also from Asian and European countries, as well as companies located in South America. The company’s management has established partnership relations primarily with domestic suppliers and customers, but also with selected contractors in Germany. The cooperation with other business partners is based on several years’ contracts, but without information integration in terms of crucial material flows performance. The customers send their demand forecasts for the following months of the year to the surveyed company, following the contract signed, but the final orders may differ up to 50% from the reported monthly demand forecasts The evaluation procedure has been prepared based on the following: • Face-to-face interviews with senior and middle management and with the management board, based on a structured interview aimed at identifying procedures and tools for risk management areas according to the proposed approach; • Accompanying direct observation carried out between October 2019 and January 2020; • Document workflow analysis; • Analysis of the scope of prepared reports and indicators The assessment procedure has been carried out according to Steps 1 and 2 of the scheme given in Figure 5 . The analytical procedure was carried out for two models of logistic risk management assessment: • Option 1–traditional core areas of RMM models described in the literature were assessed; • Option 2–traditional assessment areas have been extended to include the area of cooperation in risk management Due to the fact that in option 1–4 areas are assessed, while in option 2–5 areas, each assessment procedure required separate weights for the analyzed areas. The weights in both options were determined by the management board and the logistics department managers Therefore, one should consider that the weight values may be modified according to the managerial decisions taken in the company. Moreover, they are company-specific, and one will need to be aware that they can take different values from one company to another According to the assessed areas, the company’s logistical risk management characteristics are presented in Table 3 . The weights assigned to each of the areas in both analytical variants, as well as the estimated level of maturity, are presented in Table 4 . The carried out analytical process indicates that by assessing according to the classic RMM areas, the company achieves a global logistic process management maturity indicator at level 3. This means that the company already has qualitative tools for assessing risks in its delivery systems. Thus, the effects of potentially occurring adverse events can be effectively minimized by managers. The weaker area in the evaluated company is process risk management. Emergency management modes are developed only for critical adverse events occurring in delivery processes. The company also lacks focus on implementing preventive actions or actions to limit the consequences of undesirable events occurrence.

[[[ p. 14 ]]]

[Summary: This page describes the characteristics of areas subject to an assessment of the risk management maturity in the company’s logistic processes. It presents a table evaluating the maturity of the risk management system in the logistic processes under two options: traditional RMM and the extended LRMM. It presents the weights assigned to each area.]

Sustainability 2021 , 13 , 659 14 of 19 Table 3. Characteristics of areas subject to an assessment of the risk management maturity in the company’s logistic processes Area Characteristics of the Area in the Analyzed Company Knowledge In the case of an adverse event that occurred in supply processes, managers collect information from team members on the causes of the event and determine the consequences of its occurrence. Undesirable events, which are the most important in their assessment, are recorded in a shared spreadsheet with the date of occurrence Risk assessment Risk identification and analysis is prepared for every request of the company management. However, the analysis is prepared by a small team of the CEO’s closest associates. Based on the information entered by logistics specialists into the spreadsheet, the logistics director determines critical events. These are registered cases with many repetitions or effects that significantly affect the company’s market position. For critical events, managers must periodically prepare a risk analysis based on their observations and knowledge. Information on the identified risks is communicated to the management board and selected managers Process risk management For critical events, particularly for which the consequences determine an enterprise’s competitive position, logistic managers are required to develop emergency procedures. These actions are primarily aimed at maintaining the continuity of the company’s operations and a quick return to the declared level of logistical service Cooperation at risk Prepared scenarios for emergency procedures assume integration of activities of selected functional areas. For this reason, information on critical events is placed in spreadsheets to which managers of all functional areas have access. However, the cooperation procedure applies only to events critical to the company’s operations Risk monitoring Information on critical events is communicated only to selected managers and only for the management board’s explicit indication. No exchange of information on adverse events with contractors, even those with whom the company cooperates in partnership relations Table 4. Evaluation of the maturity of the risk management system in the logistic processes Option 1 Option 2 Area Weights for Area Maturity Level Weights for Area Maturity Level Knowledge 0.2 3 0.1 3 Risk assessment 0.3 3 0.3 3 Process risk management 0.3 2 0.3 2 Risk monitoring 0.2 3 0.1 3 Cooperation at risk - - 0.2 1 ML indicator 2.7 2.3 However, it should be noted that the analysis carried out according to the proposed extended logistic risk management maturity model (LRMM) takes the company back to level 2. This is due to the fact that managers do not benefit in any way from their position in the logistics chain or the developed relationships with their business partners. In the case of the overall risk management model, which is primarily oriented towards the company’s performed inside processes, this fact would not be decisive. However, in the case of logistic processes that are carried out at the interaction of all partners in the supply chain, such a low level of maturity in this area is crucial for the entire logistic risk management system Therefore, the proposed maturity assessment model has also been used to improve the current logistic risk management system. Based on the assumptions required for the next level of maturity in both areas of the proposed LRMM model, scenarios of changes (improvements) required by the company have been developed. These scenarios are presented in Table 5 .

[[[ p. 15 ]]]

[Summary: This page continues the results and discussion section by outlining scenarios for improving the risk management system for the analyzed company. It focuses on change management in risk assessment and risk process management. It proposes steps for cooperation between departments and information transmission to business partners.]

Sustainability 2021 , 13 , 659 15 of 19 Table 5. Scenarios for improving the risk management system for the analyzed company CHANGE MANAGEMENT Risk Assessment Risk Process Management AS–IS ANALYSIS No exchange of information on adverse events occurring in the supply chain Process emergency procedures designed for critical events only TO–BE SCENARIO Step 1: Cooperation between departments within the company to reduce the impact and likelihood of adverse events occurrence Step 1: Use of risk analysis results for planning vulnerable processes Step 2: Transmission of the information on potential disruptions in supply/orders to business partners Step 2: Development of preventive procedures and management scenarios for identified adverse events The company’s activities should primarily focus on the possibility of mitigating potential logistical disruption by exchanging information along the supply chain. This cooperation should primarily involve suppliers and customers with whom the company has partnership relations. Information on undesirable events provided insufficient advance will allow better management of the material flow along the supply chain, for example, by creating back-up buffers at specific points in the logistics network. Carrying out the proposed to-be scenario will allow the organization to reach the next level of maturity in the area of cooperation at risk and go straight to the third maturity level. The simultaneous observations made by the research team during the indicated period show that the implementation of the proposed scenario is now possible in the company’s logistic risk management system 5. Conclusions and Directions for Further Research In the classic maturity assessment models, the focus is primarily on internal processes related to risk management. The analysis of the risk maturity assessment models described in [ 56 ] and presented in the form of a mind map in Figure 2 shows that in the classical approach to risk management, the focus of decision makers is primarily on the development of internal tools and systems for risk analysis and management. This approach is consistent with the concept of Enterprise Risk Management. The strategy defines risk management as a process, which is conducted by directors, board of directors and other staff, included in the organization’s strategy and implemented throughout the enterprise in order to: (1) Identify potential events that could adversely affect the business unit, (2) manage the magnitude of their risk, and (3) ensure the achievement of the organization’s objectives [ 11 ]. As a result, the potential for risk management is limited solely to the organization’s internal resources. However, many publications indicate that today’s supply chains are competing with each other, not individual companies [ 58 ]. As organizations build their competitive position on the basis of their participation in the supply chain, it also seems appropriate to manage risks in cooperation with supply chain participants, particularly in the area of logistical flows performance. This is confirmed by the concept of supply chain risk management, which is described, among others, in [ 3 , 28 , 31 ]. If this approach is appreciated by managers, the cooperation element must also be included in methods/models aimed at assessing the level of maturity in risk management, in particular for logistics systems at the interface between the links in the supply chain Therefore by combining both investigated approaches—supply chain risk management and organizational maturity modelling, a company can not only improve its internal risk management procedures but, above all, take advantage of information integration in the supply chain. This reduces the likelihood of adverse events occurrence, or may reduce their negative consequences by a fast reaction of the supply chain. Thus, the classic model does not allow the potential for improvement of supply chain risk management resulting from partnership cooperation in the supply chain to be identified. Moreover, it does not give the possibility to define directions to improve the company’s risk management system by using information integration with partners cooperating in the supply chain. Therefore,

[[[ p. 16 ]]]

[Summary: This page presents the conclusions and directions for further research. It emphasizes the limitations of classic maturity assessment models that focus primarily on internal processes. It highlights the importance of managing risks in cooperation with supply chain participants, particularly in the area of logistical flows performance.]

Sustainability 2021 , 13 , 659 16 of 19 in the article, the authors have developed a model for assessing risk management maturity in logistics processes, which can be a diagnostic and planning tool. The novelty of the proposed approach is based on introducing a new area of risk maturity assessment based on participation in the supply chain—cooperation at risk—which has made it possible to take account of the dependencies in the supply chain. A 5-grade maturity assessment scale is also proposed in order to define the risk assessment maturity achieved by an organization dedicated to logistic processes The proposed model has been implemented in the process of logistic audits in the selected production company. The assessment procedure for the selected case allowed us to verify the complexity of the adopted procedure, the substantive scope of the developed assessment tool and allowed us to determine the intensity of implementation work. In addition, the proposed solution has been compared with traditional models of risk analysis, which use the four traditional core assessment areas. The results obtained for the case under consideration has demonstrated the superiority of the proposed 5-level assessment approach over the classic risk management of logistics processes. The presented example of the method application allowed its usefulness and adequacy to the needs of the area of logistics risk management in the surveyed company to be determined. The assessment procedure also showed an average workload of measurements. This results from a precisely developed evaluation system, described in the form of precisely defined characteristics for particular levels of maturity and understandable rules for assigning scores at both stages of the proposed procedure. The managers of the surveyed company evaluated the described assessment model positively and found it useful both in the diagnostic phase as well as in the process of changes aimed at increasing the resilience of logistics processes We recommend the application of the proposed model in production, distribution and even service-providing companies of different sizes and scope of operation. However, in order to be able to formulate general conclusions about the application of the adopted method in different types of companies, qualitative research will be carried out to assess the usefulness of the proposed LRMM model. Positive verification of the proposed model’s diagnostic function is necessary to predispose it to implementation in the logistic audit procedure, taking into account risk management aspects in the company. The studies should also assess the usefulness of the LRMM as a tool to support planning processes Then this method can be used in consulting projects to improve the risk management system and build the resilience of logistic processes to the occurring disturbances. Moreover, one of the authors’ future research directions is focused on the performance of interviews among a representative research sample (interviews of managers from different sectors and company’s sizes), what gives the possibility to generalize the obtained results. Conducting such a research step with implementation of the developed model in different companies, will enable the setting of new standards in the area of risk maturity management in logistics processes At this stage of carried out research analyses, the authors may point out two main possible limitations of the proposed model. First, the model limitation may be connected with the managers’ correctness of the assessment carried out. The managers may give incorrect answers during the internal audit performance to obtain higher ratings than the actual level of achieved maturity of supply chain risk management. The second possible limitation is the possibility of omission of specific steps during the proposed assessment procedure performance. Following this, to obtain reliable results, it is necessary to follow the procedure and appropriately evaluate the actual level of the areas being assessed in the model As a result, this research makes significant contributions to the theory and practice of supply chain risk assessment. First, a new approach for risk management maturity assessment was proposed. Second, the presented approach can be a valuable tool to support real-life systems’ decision-making processes, as confirmed by the sample company investigated The presented implementation of the LRMM model for the investigated company has obtained positive results. However, as it has been stated, they are insufficient to

[[[ p. 17 ]]]

[Summary: This page continues the conclusions and directions for further research, focusing on the need for a model that can be a diagnostic and planning tool. It discusses the limitations of the proposed model, related to managers’ correctness of the assessment and the possibility of omission of specific steps during the assessment procedure performance.]

Sustainability 2021 , 13 , 659 17 of 19 make a generalized conclusion. Therefore, as part of the authors future research, further validation of the assumptions made in the developed model is justified. For this purpose, it is necessary to conduct interviews among a representative research sample and their statistical analysis allowing the results obtained to be generalized according to generally applicable rules. Therefore, the authors plan to conduct structured interviews among logistics managers, aimed at obtaining their opinions on the usefulness, completeness, ease of conducting and practical application of the developed assessment tool. At the same time, implementations will be carried out in other sectors and among other participants of supply chains. Such analyses will allow to assess the universality of the adopted approach and indicate possible directions of specialization required due to the requirements resulting from the specificity of a given organization’s activity. Implementation in companies will also allow for the development of a set of good practices that may support the practical application of the proposed tool. On the basis of good practices, it will also be possible to develop the so-called road maps for the application of the proposed LRMM model, which, apart from the basic assumptions, will also include guidelines for its implementation Additionally, the authors’ future research can focus on uncertainty in the decisionmaking process by implementing fuzzy theory into the risk maturity levels assessment. This provides a more adjusted assessment procedure as managers may have difficulty assigning a specific level of maturity to their organization. Moreover, following the risk-based asset management approach, the proposed risk management maturity model may be extended to provide a comprehensive measurement method in this area. Following this, a new hybrid maturity index ratio will be developed, including both risk and resilience parameters Author Contributions: Conceptualization, A.A.T. and S.W.-W.; methodology A.A.T. and S.W.-W.; validation, A.A.T. and S.W.-W.; formal analysis, A.A.T. and S.W.-W.; investigation, A.A.T. and S.W.-W.; resources, A.A.T. and S.W.-W.; data curation, A.A.T. and S.W.-W.; writing—original draft preparation, A.A.T. and S.W.-W.; writing—review and editing, A.A.T. and S.W.-W.; visualization, A.A.T. and S.W.-W. All authors have read and agreed to the published version of the manuscript Funding: This research received no external funding Institutional Review Board Statement: Not applicable Informed Consent Statement: Not applicable Data Availability Statement: Data sharing not applicable Conflicts of Interest: The authors declare no conflict of interest References 1 Porter, M.E Competetive Avantage: Creating and Sustaining Superior Performance ; The Free Press: New York, NY, USA, 1985 2 Hong, P.; Kwon, H.B.; Roh, J.J. Implementation of strategic green orientation in supply chain Eur. J. Innov. Manag 2009 , 12 , 512–532. [ CrossRef ] 3 Fan, Y.; Stevenson, M. A review of supply chain risk management: Definition, theory, and research agenda Int. J. Phys. Distrib 2018 , 48 , 205–230. [ CrossRef ] 4 Chowdhury, M.M.H.; Quaddus, M. Supply chain readiness, response and recovery for resilience Supply Chain Manag 2016 , 21 , 709–731. [ CrossRef ] 5 Aven, T. On how to conceptualise and describe risk Reliab. Theory Appl 2011 , 2 , 28–37. [ CrossRef ] 6 Aven, T. The risk concept-historical and recent development trends Reliab. Eng. Syst. Safe 2012 , 99 , 33–44. [ CrossRef ] 7 Aven, T Risk Analysis , 2 nd ed.; John Wiley and Sons: Hoboken, NJ, USA, 2015. [ CrossRef ] 8 Aven, T. Risk assessment and risk management: Review of recent advances on their foundation Eur. J. Oper. Res 2016 , 253 , 1–13 [ CrossRef ] 9 Bukowski, L. Logistics decision-making based on the maturity assessment of imperfect knowledge Eng. Manag. Prod. Serv 2019 , 11 , 65–79. [ CrossRef ] 10 Bukowski, L Reliable, Secure and Resilient Logistics Networks: Delivering Products in a Risky Environment, Reliable, Secure and Resilient Logistics Networks ; Springer: Berlin/Heidelberg, Germany, 2019. [ CrossRef ] 11 COSO Enterprise Risk Management—Integrated Framework Executive Summary ; COSO: New York, NY, USA, 2004; Available online: https://www.coso.org/Documents/COSO-ERM-Executive-Summary.pdf (accessed on 21 November 2020) 12 Mokgoantle, O.J Risk Maturity at a Life Insurer ; M.Com. (Finance); University of Johannesburg: Johannesburg, South Africa, 2012.

[[[ p. 18 ]]]

[Summary: This page continues the references section of the article.]

Sustainability 2021 , 13 , 659 18 of 19 13 Alcantara, P.; Riglietti, G Supply Chain Resilience Report 2016 ; Business Continuity Institute: Zurich, Switzerland, 2016; Available online: https://www.zurich.com.sg/-/media/project/zwp/singapore/docs/corporate-solutions/bcisupplychainresiliencereport 2 016 web.pdf (accessed on 21 November 2020) 14 Riglietti, G.; Aguada, L Supply Chain Resilience Report 2018 ; Business Continuity Institute: Zurich, Switzerland, 2018; Available online: https://www.thebci.org/uploads/assets/uploaded/c 50072 bf-df 5 c-4 c 98-a 5 e 1876 aafb 15 bd 0.pdf (accessed on 21 November 2020) 15 Elliott, R.; Thomas, C.; Muhammad, K Supply Chain Resilience Report 2019 ; Business Continuity Institute: Zurich, Switzerland, 2019; Available online: https://www.thebci.org/uploads/assets/e 5803 f 73-e 3 d 5-4 d 78-9 efb 2 f 983 f 25 a 64 d/ BCISupplyChainResilienceReportOctober 2019 SingleLow 1.pdf (accessed on 21 November 2020) 16 Nowakowski, T.; Scroubelos, G.; Tubis, T.; Werbi ´nska-Wojciechowska, S.; Chlebus, M. Sustainable Supply Chains Versus Safety and Resilience. In Sustainable Logistics and Production in Industry 4.0. EcoProduction (Environmental Issues in Logistics and Manufacturing) ; Grzybowska, K., Awasthi, A., Sawhney, R., Eds.; Springer: Cham, Switzerland, 2020; pp. 65–87 17 Rao, S.; Goldsby, T.J. Supply chain risks: A review and typology Int. J. Logist. Manag 2009 , 20 , 97–123. [ CrossRef ] 18 Ivanov, D.; Dolgui, A.; Sokolov, B.; Ivanova, M. Disruptions in supply chains and recovery policies: State-of-the art review IFAC PapersOnLine 2016 , 49 , 1436–1441. [ CrossRef ] 19 Singhal, P.; Agarwal, G.; Mittal, M.L. Supply chain risk management: Review, classification and future research directions Int. J Bus. Sci. Appl. Manag 2010 , 6 , 15–42 20 Ghadge, A.; Dani, S.; Kalawsky, R. Supply chain risk management: Present and future scope Int. J. Logist. Manag 2012 , 23 , 313–339. [ CrossRef ] 21 Ceryno, P.S.; Scavarda, L.F.; Klingebiel, K.; Yuzgulec, G. Supply chain risk management: A content analysis approach Int. J. Ind Eng. Manag 2013 , 4 , 141–150 22 Ouabouch, L.; Pache, G. Risk management in the supply chain: Characterization and empirical analysis J. Appl. Bus. Res 2014 , 30 , 329–340 23 Tran, T.H.; Dobrovnik, M.; Kummer, S. Supply chain risk assessment: A content analysis-based literature review Int. J. Logist Manag 2018 , 31 , 562–591. [ CrossRef ] 24 Pournader, M.; Kach, A.; Talluri, S. A Review of the Existing and Emerging Topics in the Supply Chain Risk Management Literature Decis. Sci 2020 . [ CrossRef ] 25 Macdonald, J.R.; Corsi, T.M. Supply chain disruption management: Severe events, recovery, and performance J. Bus. Logist 2013 , 34 , 270–288. [ CrossRef ] 26 Ellis, S.C.; Shockley, J.; Henry, R.M. Making sense of supply disruption risk research: A conceptual framework grounded in enactment theory J. Supply Chain Manag 2011 , 47 , 65–96. [ CrossRef ] 27 Wagner, S.M.; Bode, C. An empirical examination of supply chain performance along several dimensions of risk J. Bus. Logist 2008 , 29 , 307–325. [ CrossRef ] 28 Manuj, I.; Esper, T.L.; Stank, T.P. Supply chain risk management approaches under different conditions of risk J. Bus. Logist 2014 , 35 , 241–258. [ CrossRef ] 29 Olson, D.L.; Swenseth, S.R. Trade-offs in supply chain system risk mitigation Syst. Res. Behav. Sci 2014 , 31 , 565–579. [ CrossRef ] 30 Talluri, S.; Kull, T.J.; Yildiz, H.; Yoon, J. Assessing the efficiency of risk mitigation strategies in supply chains J. Bus. Logist 2013 , 34 , 253–269. [ CrossRef ] 31 Hult, G.T.M.; Craighead, C.W.; Ketchen, D.J. Risk uncertainty and supply chain decisions: A real options perspective Decis. Sci 2010 , 41 , 435–458. [ CrossRef ] 32 Käki, A.; Salo, A.; Talluri, S. Disruptions in Supply Networks: A Probabilistic Risk Assessment Approach J. Bus. Logist 2015 , 36 , 273–287. [ CrossRef ] 33 Adhitya, A.; Srinivasan, R.; Karimi, I.A. Supply Chain Risk Identification Using a HAZOP-Based Approach AIChE J 2009 , 55 , 1447–1463. [ CrossRef ] 34 Saud, Y.E.; Israni, K.; Goddard, J. Bow-Tie diagrams in downtream hazard identification and risk assessment Process Saf. Prog 2014 , 33 , 26–35. [ CrossRef ] 35 Peˇcek, B.; Kovaˇciˇc, A. Methodology of monitoring key risk indicators’, Economic Research-Ekonomska Istrazivanja Econ. Res 2019 , 32 , 3485–3501. [ CrossRef ] 36 Wibowo, M.A.; Waluyo, R. Knowledge management maturity in construction companies Procedia Eng 2015 , 125 , 89–94 [ CrossRef ] 37 Rudnicka, A. Sustainable supply chain maturity model Res. Log. Prod 2017 , 7 , 201–209. [ CrossRef ] 38 Murray-Webster, R.; Williams, G. (Eds.) Risk Management: A Guide for Practitioners ; The Stationery Office: Warsaw, Poland, 2010 (In Polish) 39 Van Looy, A Business Process Maturity. A Comparative Study on a Sample of Business Process Maturity Models ; vom Brocke, J., Liechtenstein, V., Eds.; Springer: Berlin/Heidelberg, Germany, 2014. [ CrossRef ] 40 Business Process Maturity Model (BPMM) Version 1.0. OMG Document Number: Formal/2008-06-01. 2008. Available online: http://www.omg.org/spec/BPMM/1.0/PDF (accessed on 2 November 2020).

[[[ p. 19 ]]]

[Summary: This page concludes the references section of the article.]

Sustainability 2021 , 13 , 659 19 of 19 41 Juchniewicz, M. Project maturity of an organization as a tool to improve project management processes. In Modern Concepts of Production, Quality and Logistics Management ; Lachiewicz, S., Matejun, M., Eds.; Lodz: Publ. House of Lodz University of Technology: Lodz, Poland, 2010; pp. 287–305. (In Polish) 42 Chrapko, M CMMI Improvement of Processes in Organization ; Polish Scientific Publishers PWN: Warsaw, Poland, 2010; (In Polish) [ CrossRef ] 43 Lee, D.; Gu, J.W.; Jung, H.W. Process maturity models: Classification by application sectors and validities studies J. Softw. Evol Proc 2019 , 31 , 1–30. [ CrossRef ] 44 Helgesson, Y.Y.L.; Host, M.; Weyns, K. A review of methods for evaluation and maturity models for process improvement J Softw. Maint. Evol. R 2012 , 24 , 436–454. [ CrossRef ] 45 Pino, F.J.; Baldassarre, M.D.; Piattini, M.; Vissaggio, G. Harmonizing maturity levels from CMMI_DEV and ISO_IEC 15504 J Softw. Evol. Proc 2010 , 22 , 279–296. [ CrossRef ] 46 Albu, E.; Panzar, C. A new tool for assessing maturity alignment: The Enterprise Maturity Matrix Perform. Improv 2010 , 49 , 35–47. [ CrossRef ] 47 Kosieradzka, A.; Smagowicz, J. Concept of maturity model of organization in the area of public crisis management Sci. Notebooks Silesian Univ. Technol. Ser. Org. Manag 2018 , 128 , 217–230. (In Polish) 48 Cheshmberah, M.; Beheshtikia, S. Supply chain management maturity: An all-encompassing literature review on models, dimensions and approaches LogForum 2020 , 16 , 103–116 49 Scott, S.H. Supply Chain Management Maturity Level Assessment Defense ARJ 2017 , 24 . [ CrossRef ] 50 Correia, E.; Calvalho, H.; Azevedo, S.G.; Govindan, K. Maturity models in supply chain sustainability: A systematic literature review Sustainability 2017 , 9 , 64. [ CrossRef ] 51 Facchini, F.; Ole´sk ó w-Szłapka, J.; Ranieri, L.; Urbinati, A. A maturity model for logistics 4.0: An empirical analysis and a roadmap for future research Sustainability 2020 , 12 , 86. [ CrossRef ] 52 Hofman, W. Data sharing requirements of supply—And logistics innovations—Towards a maturity model. In Proceedings of the ILS 2016—6 th International Conference on Information Systems, Logistics and Supply Chain, Bordeaux, France, 1–4 June 2016; pp. 1–8 53 Kasse, T.; Johansen, J. Maturity differences between customer and supplier - challenges, problems, and possible solutions J. Softw Evol. Proc 2014 , 26 , 295–305. [ CrossRef ] 54 Netland, T.; Alfnes, E.; Fauske, H. How mature is your supply chain? A supply chain maturity assessment test. In Proceedings of the 14 th International EurOMA Conference “Managing Operations in an Expanding Europe”, Ankara, Turkey, 17–20 June 2007; pp. 1–10. Available online: https://www.sintef.no/project/SMARTLOG/Publikasjoner/2007/Netland%20 etal%20_2007_%2 0 How%20 mature%20 is%20 your%20 supply%20 chain.pdf (accessed on 2 November 2020) 55 Zou, P.X.W.; Chen, Y.; Chan, T.Y. Understanding and improving your risk management capability: Assessment model for construction organizations J. Constr. Eng. Manag 2010 , 136 , 854–863. [ CrossRef ] 56 Caiado, R.G.G.; Lima, G.B.A.; de Mattos Nascimento, D.L.; Neto, J.V.; de Oliveira, R.A.M. Guidelines to Risk Management Maturity in Construction Projects Braz. J. Oper. Prod. Manag 2016 , 13 , 372–385. [ CrossRef ] 57 Sawalha, I.H.S. Collaboration in crisis and emergency management: Identifying the gaps in the case of storm “Alexa” J. Bus Contin. Emer. Plan 2014 , 7 , 312–323. [ PubMed ] 58 Christopher, M Logistics and Supply Chain Management: Strategies for Reducing Costs and Improving Service ; Financial Times— Prentice Hall: London, UK, 1998.

Other Environmental Sciences Concepts:

[back to top]

Discover the significance of concepts within the article: ‘Risk Management Maturity Model for Logistic Processes’. Further sources in the context of Environmental Sciences might help you critically compare this page with similair documents:

Manager, Knowledge, System, Good practice, Qualitative research, Competitive advantage, Risk assessment, Decision-making processes, Knowledge base, Emergency management, Supply chain, Assessment Scale, Risk Management, Diagnostic procedure, Risk identification, Risk analysis, Supply chain management, Adverse event, Knowledge Management, Sustainability, Emergency procedure, Supply chain disruption, Risk monitoring, Evaluation System, Internal audit, Structured Interview, Diagnostic role, Research sample, Maturity assessment, Weighted average, Enterprise risk management, Learning organization, Information integration, Assessment model, Assessment procedure, Risk-mitigation strategies, Global supply chain, Risk management strategy, Management board, Critical event, IT system, Planning processes, Associated risk, Fuzzy theory, Maturity Model, Maturity level, Supply chain risk management, Supply Chain Performance, Logistics operations, Business process, Supply chain sustainability, Supply Chain Decisions, Global index, Operational strategy, Business partner, Qualitative Tool, Risk management tool, Risk response, Decision-Making Environment, Potential adverse events, Lack of risk management, Research analyses.

Let's grow together!

I humbly request your help to keep doing what I do best: provide the world with unbiased sources, definitions and images. Your donation direclty influences the quality and quantity of knowledge, wisdom and spiritual insight the world is exposed to.

Let's make the world a better place together!

Like what you read? Help to become even better: